Field test: PV Modules

A real world comparison between Mono, Poly, PERC and Dual PV Modules.

Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
S
Total solar yield: --
E
Total solar yield: --
W
Romania
--
--
Installation date: 09-03-2020
--
--
--
--
--
--
--
Irradiance

* This is a field test and the results are specific for this installation on this location please research which is the best solution for your own situation as the results can be different based on environmental influences.

Total solar yield as of 27/03/2023 when the results were reset:
Mono: 9158 kWh
Split-cell: 9511 kWh
Poly: 9113 kWh
Perc: 9471 kWh
Perc-east: 1970 kWh
Perc-west: 1730 kWh

Configuring solar systems with Quattros and Multis

Good day!

To help determine which settings are the most suitable for different types of solar systems using a Victron Energy Quattro or MultiPlus Inverter/Charger, we have developed a guide: VE.Bus-solar-system-configs (an Excel *.xlsx file). There is also identical content in this PDF guide, for those that don’t have Excel.

This guide is a decision tree that will help installers discuss system installations with their customers. By choosing one answer that best reflects a system (for each of four questions asked) a recommended software configuration will be arrived at. Here are the details of those four questions:

Q 1: What type of system?

  1. A backup system: the (only) goal of the energy stored in the battery is to power the loads during a mains outage.
  2. A pure self-consumption system: all energy stored in the battery can be used to power the loads when there is no, or not enough solar power available.
  3. A self-consumption system with a battery reserve: a mix of the two types above. For example use the top 30% of the battery to increase the self-use of solar power, whilst keeping the other 70% available for a mains outage.
  4. Off-grid site: no mains available. Only a genset, or not even that.
  5. Intentional islanding: used in countries with a bad grid. For example with brown outs and spikes. In this case it is preferred to always run in Inverter mode, even when the public grid is available. The well known corresponding setting is AC Ignore in VEConfigure3.

Q 2: How to charge the batteries?

  1. Always: typically for a backup system: when the power is restored, the customer wants to have the battery recharged as fast as possible, which includes recharging the battery with power from the grid.
  2. PV Only: use only power coming from the sun to charge the batteries, except when the lifetime of the battery is at stake. For example, a prolonged shortage due to bad weather. In that case Sustain will use a minimal amount of energy from the grid to keep the batteries in a healthy state.
  3. Genset.

Q 3: Is feed-in allowed?

This is an important and changing political topic in many countries. In Spain there is even a tax on energy harvested from the sun, for systems that are totally off-grid! Politics aside for now, the different answers we have seen are:

  1. Feed-in is wanted: the meter runs in reverse, or there is some other mechanism in place that lets the customer sell energy back to the utility.
  2. Feed-in is no problem, but not wanted either: all energy being fed back is lost, in a sense that it is not being payed for by the utility. But it doesn’t hurt either.
  3. Feed-in is absolutely not wanted, not even for a few seconds: to illustrate, there are certain prepaid meters in South-Africa that will disconnect the customer when it detects energy being fed back into the grid.
  4. Feed-in is not wanted, because every kWh being fed back is just counted as energy being used and feeding back increases the end-customer’s energy bill instead of decreasing it.

Q 4: PV Inverters or MPPT Solar Charge Controllers?

  1. If PV Inverters, look for the lines in the Excel sheet that state AC-Coupled.
  2. If MPPT Solar Charge controllers, look for the lines in the guide that state DC-Coupled.

Configuration solution

Having answered the four questions together with the user of the system, look in the guide to see where the decision tree guides you.

Hub-4 for a system containing only MPPTs?

One thing you’ll find when examining the guide is that the Hub-4 Assistant shows up in many places, even in systems with MPPT Charge Controllers. This solution has several advantages over the other Assistants. To name but a few:

See the last question in the Hub-4 FAQ for more details on making a DC-Coupled system with the Hub-4 Assistant.

Conclusion

I am convinced this guide will help you find the right approach in designing systems for your customers. It has certainly helped me recently when guiding dealers and distributors, as well as end-customers. We’ll be improving the guide and further simplifying the software setup as we move along, which will help us come closer and closer to our end-goal: setting up a system should be simple and intuitive.

In case of any questions, please use the Disqus comments section below.

Best regards,

Matthijs

Avatar of Matthijs Vader
Previous
Caravan Salon Düsseldorf 2016: 26 August - 04 September 2016
Next
VictronConnect v2.0

Related blogs