Appendix A. Connection overview
A | Load connection 1 - AC-OUT 2 - From left to right: L2 (phase 2), N (neutral), PE (earth/ground), L1 (phase 1) |
B | AC input 1 - AC-IN 2 - From left to right: L2 (phase 2), N (neutral), PE (earth/ground), L1 (phase 1) |
C | Auxiliary relay - From left to right: NO, NC, COM |
D | Primary ground connection (PE) - M8 bolt |
E | Trickle charge positive terminal |
F | Battery positive connections - 2 x M8 bolt |
G | Battery minus connections - 2 x M8 bolt |
H | Power switch - To switch: 1=On, 0=Off, ||=charger only |
I | Push button A - To perform a startup without assistants |
J | Load connection 2 - AC-OUT 2 - From left to right: L2 (phase 2), N (neutral), PE (earth/ground), L1 (phase 1) |
K | AC input 2 - AC-IN 2 - From left to right: L2 (phase 2), N (neutral), PE (earth/ground), L1 (phase 1) |
M | VE.Bus connectors - 2x RJ45: For remote control and/or parallel / three-phase operation |
L | Remote on/off connector - Short contact to switch to “on” |
N | I/O Terminal, from top to bottom:
|