Appendix A. Connection overview
A | Load connection. AC out1. Left to right: N (neutral), PE (earth/ground), L (phase) |
B | Load connection. AC out2. Left to right: N (neutral), PE (earth/ground), L (phase) |
C | AC input 2: Left to right: N (neutral), PE (earth/ground), L (phase) |
D | AC input 1: Left to right: N (neutral), PE (earth/ground), L (phase) |
E | Alarm contact: (left to right) NO, NC, COM. |
F | Push button A - To perform a startup without assistants |
G | Primary ground connection M6 (PE). |
H | Trickle charge (12 and 24V model only) |
I | M8 battery positive connection. |
J | M8 battery minus connection. |
K | switch: 1=On, 0=Off, ||=charger only |
L | Connector for remote switch: Short to switch “on”. |
M | 2x RJ45 VE-BUS connector for remote control and/or parallel / three-phase operation |
N | Terminal for: top to bottom:
|