ve.bus:skip-absorption
Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
ve.bus:skip-absorption [2023-05-16 16:02] – created mvader | ve.bus:skip-absorption [2023-07-28 17:25] (current) – mvader | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | (draft) | + | [[solar-and-wind-priority|moved here]] |
- | Reason for this page is that we'll add a link into VEConfigure (& VictronConnect) to explain a new feature that is being added. | ||
- | |||
- | Which makes the inverter/ | ||
- | |||
- | To be detailed in more detail later. | ||
- | |||
- | |||
- | |||
- | Target: boats, campers, and so forth that want their solar charger to take care of most of charging when connected to shore power; either while travelling but also when back home. | ||
- | | ||
- | And that want the Multi to be there as a backup to make sure batteries are not left alone in case there is no or not enough charger; and want an option in their enduser-controls to force a charge whenever they need it. | ||
- | |||
- | Details: | ||
- | |||
- | - for a Quattro, this will only work when connected to AC-in-2, since AC-in-1 is where a generator is connected and while that is running you want to charge with full power. | ||
- | - if storage is enabled in its settings, then after a hardcoded 12 hours go to storage |
ve.bus/skip-absorption.1684245772.txt.gz · Last modified: 2023-05-16 16:02 by mvader