mppt-error-codes
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mppt-error-codes [2024-02-12 05:48] – [Err 54 - Inverter output voltage] guy_stewart | mppt-error-codes [2025-06-12 16:13] (current) – [Err 74 - Too many in parallel] rvanzundert | ||
|---|---|---|---|
| Line 241: | Line 241: | ||
| Make sure all settings are the same and update firmware on all chargers to the latest version. | Make sure all settings are the same and update firmware on all chargers to the latest version. | ||
| + | |||
| + | This error also appears if MPPTs are connected to a GX device while configured for a VE.Smart network. Disable the VE.Smart networking features and use DVCC on the GX instead. | ||
| + | |||
| + | [[https:// | ||
| + | |||
| Line 308: | Line 313: | ||
| The inverters remain operational, | The inverters remain operational, | ||
| - | ==== Err 74 - Phase overload | + | ==== Err 74 - Too many units in parallel |
| Applies to Inverter RS and Multi RS models. Firmware versions 1.12 and higher. | Applies to Inverter RS and Multi RS models. Firmware versions 1.12 and higher. | ||
| The number of inverters in parallel doesn' | The number of inverters in parallel doesn' | ||
| - | Firmware v1.12 does not support parallel units and a grid connection, so any combination of a Multi RS with a grid connection with more than one unit in parallel will trigger this error code on the Multi RS. The Multi RS only supports 3 units in 3-phase configuration at the moment. | + | The firmware |
| The inverters remain operational, | The inverters remain operational, | ||
| + | |||
| + | ==== Err 75 - Network misconfigured ==== | ||
| + | Applies to Multi RS models. Firmware versions 1.19 and higher. | ||
| + | |||
| + | Three phase operation is not yet certified in combination with the selected grid code. | ||
| + | |||
| + | The inverters remain operational, | ||
| + | |||
| + | ==== Err 76 - Network incomplete ==== | ||
| + | Applies to Inverter RS and Multi RS models. | ||
| + | |||
| + | The inverters shut down because there are insufficient units to operate a networked setup. Check if all required units are powered on and that the CAN interface cables are connected properly. | ||
| + | All units remain off until the installation is fixed, after which the units resume operation. | ||
| + | |||
| + | Related configuration settings in VictronConnect are " | ||
| ==== Err 80, Err 81, Err 82, Err 83, Err 84, Err 85, Err 86 and Err 87 - PV Input shutdown ==== | ==== Err 80, Err 81, Err 82, Err 83, Err 84, Err 85, Err 86 and Err 87 - PV Input shutdown ==== | ||
mppt-error-codes.1707713331.txt.gz · Last modified: by guy_stewart