mppt-error-codes
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
mppt-error-codes [2018-05-09 10:27] – [Err 116 - Calibration data lost] rvanzundert | mppt-error-codes [2019-05-06 13:58] – [Err 68 - Network misconfigured] mvader | ||
---|---|---|---|
Line 33: | Line 33: | ||
==== Err 18 - Controller over-current ==== | ==== Err 18 - Controller over-current ==== | ||
This error will auto-reset. | This error will auto-reset. | ||
- | Disconnect | + | If the error does not auto-reset disconnect |
- | If the error persists the charge controller is probably faulty. | + | A cause for this error can be switching on a very large load on the battery side. |
==== Err 20 - Maximum Bulk-time exceeded ==== | ==== Err 20 - Maximum Bulk-time exceeded ==== | ||
Line 58: | Line 58: | ||
This error will auto-reset. | This error will auto-reset. | ||
+ | |||
+ | ==== Err 28 - Power stage issue ==== | ||
+ | |||
+ | This error will not auto-reset. | ||
+ | |||
+ | Disconnect all wires, and then reconnect all wires. If the error persists the charge controller is probably faulty. | ||
==== Err 33 - PV over-voltage ==== | ==== Err 33 - PV over-voltage ==== | ||
Line 104: | Line 110: | ||
Note that (solar-)chargers automatically configure themselves to be BMS-controlled when they are connected to one; either direct or via a Color Control GX or Venus GX. | Note that (solar-)chargers automatically configure themselves to be BMS-controlled when they are connected to one; either direct or via a Color Control GX or Venus GX. | ||
+ | |||
+ | ==== Err 68 - Network misconfigured ==== | ||
+ | |||
+ | The charger detects multiple conflicting network sources trying to take control of the charger. | ||
+ | |||
+ | Applies to SmartSolar MPPTs and SmartSolar MPPTs VE.Can. | ||
+ | |||
+ | The typical reason for the error to show is that the charger is configured to operate in parallel using our [[https:// | ||
+ | |||
+ | Resolution: disable the parallel operation by connecting VictronConnect, | ||
+ | |||
+ | For SmartSolar MPPT VE.Can only, also make sure its not connected to a [[https:// | ||
+ | |||
+ | Once the conflict is resolved the error will disappear and the charger will resume normal operation, usually within a minute. | ||
+ | |||
+ | |||
==== Err 114 - CPU temperature too high ==== | ==== Err 114 - CPU temperature too high ==== | ||
Line 124: | Line 146: | ||
- wait 3 minutes, and power up again. | - wait 3 minutes, and power up again. | ||
- Reconfigure the charger. | - Reconfigure the charger. | ||
+ | |||
===== DISQUS ===== | ===== DISQUS ===== | ||
~~DISQUS~~ | ~~DISQUS~~ | ||
+ |
mppt-error-codes.txt · Last modified: 2024-02-12 05:48 by guy_stewart