ess:design-installation-manual
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
ess:design-installation-manual [2020-07-29 15:37] – [7.2 Three-phase ESS] marmour | ess:design-installation-manual [2020-08-09 21:53] – [6. Controlling depth of discharge] jono | ||
---|---|---|---|
Line 347: | Line 347: | ||
* Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing | * Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing | ||
- | Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled | + | Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled |
- | * Lithium with active cell balancing | + | Redflow specifies that BatteryLife should be disabled in [[battery_compatibility: |
- | * [[battery_compatibility: | + | |
- | + | ||
- | However, BatteryLife //can// be disabled in these cases. | + | |
=== 4.3.2 Grid meter installed === | === 4.3.2 Grid meter installed === | ||
Line 540: | Line 537: | ||
Start the generator and check that the system begins to charge the batteries. | Start the generator and check that the system begins to charge the batteries. | ||
===== 6. Controlling depth of discharge ===== | ===== 6. Controlling depth of discharge ===== | ||
- | //(Note: All absolute voltages mentioned in the example below refer to a 12V system. Voltages should be multiplied by x2 or x4 for a 24V or 48V system, respectively.)// | + | //(Note: All absolute voltages mentioned in the example below refer to a 12V system. Voltages should be multiplied by x2 for a 24V system |
==== 6.1 Overview === | ==== 6.1 Overview === |
ess/design-installation-manual.txt · Last modified: 2021-01-14 08:35 by marmour