Line 145: Line 145:
  
 For a full or partial grid-parallel installation an Energy Meter can be installed in the main distribution panel between the grid and the installation. For a full or partial grid-parallel installation an Energy Meter can be installed in the main distribution panel between the grid and the installation.
- 
-https://www.victronenergy.com/live/energy-meterdfs 
  
 A grid meter is only //required// when there is an additional energy source (e.g. PV) connected between the grid and the //input// side of the Multi/Quattro systems. If all renewable-energy sources are connected 'downstream' (on the output side) of the inverter/chargers a grid meter will not be required, but can be added.  A grid meter is only //required// when there is an additional energy source (e.g. PV) connected between the grid and the //input// side of the Multi/Quattro systems. If all renewable-energy sources are connected 'downstream' (on the output side) of the inverter/chargers a grid meter will not be required, but can be added. 
 +
 +[[https://www.victronenergy.com/live/energy-meters:start|Click here for more information about the configuration of grid meters.]]
  
 === PV (optional) === === PV (optional) ===