 For a full or partial grid-parallel installation an Energy Meter can be installed in the main distribution panel between the grid and the installation. For a full or partial grid-parallel installation an Energy Meter can be installed in the main distribution panel between the grid and the installation.
- 
-https://​www.victronenergy.com/​live/​energy-meterdfs 
  
 A grid meter is only //​required//​ when there is an additional energy source (e.g. PV) connected between the grid and the //input// side of the Multi/​Quattro systems. If all renewable-energy sources are connected '​downstream'​ (on the output side) of the inverter/​chargers a grid meter will not be required, but can be added. ​ A grid meter is only //​required//​ when there is an additional energy source (e.g. PV) connected between the grid and the //input// side of the Multi/​Quattro systems. If all renewable-energy sources are connected '​downstream'​ (on the output side) of the inverter/​chargers a grid meter will not be required, but can be added. ​
 +
 +[[https://​www.victronenergy.com/​live/​energy-meters:​start|Click here for more information about the configuration of grid meters.]]
  
 === PV (optional) === === PV (optional) ===