ess:design-installation-manual [2020-07-29 15:37]
marmour [7.2 Three-phase ESS]
ess:design-installation-manual [2020-08-03 23:57] (current)
simonhackett [4.3 GX device - ESS Settings]
Line 347: Line 347:
   * Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing   * Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing
  
-Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled on the following battery technologiestoo:+Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled for systems using Lithium with active cell balancinghowever it //can// be disabled in this case. 
  
-  * Lithium with active cell balancing +Redflow specifies that BatteryLife should be disabled in [[battery_compatibility:redflow_zcell|Redflow ZCell]] installationsbecause the ZCell battery can rest at zero SoC without damage for an unlimited period, and also because the BatteryLife function conflicts with the ZCell battery maintenance cycle.
-  * [[battery_compatibility:redflow_zcell|Redflow ZCell]]  +
- +
-HoweverBatteryLife //can// be disabled in these cases.+
  
 === 4.3.2 Grid meter installed === === 4.3.2 Grid meter installed ===
ess/design-installation-manual.txt · Last modified: 2020-08-03 23:57 by simonhackett