energy-meters:et112 [2018-12-04 22:06] – [4. Multiple ET112 Meters in one system] robduthie | energy-meters:et112 [2019-01-21 11:09] – [DISQUS] ictbeheer | ||
---|---|---|---|
Line 23: | Line 23: | ||
===== 2. AC Wiring ===== | ===== 2. AC Wiring ===== | ||
+ | |||
+ | ==== Configuration Options ==== | ||
+ | |||
{{: | {{: | ||
- | Wiring when used as a grid meter. | + | **Grid Meter** - Wiring when used as a grid meter. |
+ | |||
+ | This configuration option of either Grid Meter, or PV Inverter is set in the [[venus-os: | ||
+ | |||
+ | ==== Example Diagram ==== | ||
+ | |||
+ | In this example configuration, | ||
+ | |||
+ | * A surplus will be used to charge the batteries (seen as export and tried to reduce to grid set point eg 0). | ||
+ | |||
+ | * A deficiency will trigger a discharge of the batteries (seen as import, and tried to reduce to grid set point). | ||
+ | |||
+ | This can be useful if the [[ess: | ||
+ | |||
+ | If you wanted to see PV production separately you could use the " | ||
+ | {{: | ||
===== 3. Connection to CCGX === | ===== 3. Connection to CCGX === | ||
Line 81: | Line 99: | ||
Note 1 You can connect the ET112 in parallel, just need to change the MOD address to another number using the Configuration | Note 1 You can connect the ET112 in parallel, just need to change the MOD address to another number using the Configuration | ||
software from the supplier which is free from Carlo Gavazzi Web site. | software from the supplier which is free from Carlo Gavazzi Web site. | ||