battery_compatibility:byd_b-box
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| battery_compatibility:byd_b-box [2026-08-14 09:34] – guy_stewart | battery_compatibility:byd_b-box [2026-10-12 04:01] (current) – guy_stewart | ||
|---|---|---|---|
| Line 47: | Line 47: | ||
| Some of our Solar Chargers feature a VE.Direct communication port, some feature a VE.Can communication port, and some feature both. Both of these types of communication ports can be used to connect the Solar charger to the GX Device. Such connection is mandatory, because it is used to regulate charge currents and voltages. | Some of our Solar Chargers feature a VE.Direct communication port, some feature a VE.Can communication port, and some feature both. Both of these types of communication ports can be used to connect the Solar charger to the GX Device. Such connection is mandatory, because it is used to regulate charge currents and voltages. | ||
| - | When planning to use the VE.Can communications port to connect the Solar Charger(s), make sure to select a GX Device that has sufficient CAN-Bus ports. The Color Control GX has only one such port, its VE.Can port, and is therefor not suitable. | + | When planning to use the VE.Can communications port to connect the Solar Charger(s), make sure to select a GX Device that has sufficient CAN-Bus ports. The Color Control GX has only one such port, its VE.Can port, and is therefor not suitable. |
| (*) with exception of the models “BlueSolar MPPT 150/70 CAN-bus” and “BlueSolar MPPT 150/85 CAN-bus” which are end-of-life since 2019. Legacy systems, historically installed with this configuration using the allow to charge contacts are not required to make any changes, see the legacy chapter below for details. | (*) with exception of the models “BlueSolar MPPT 150/70 CAN-bus” and “BlueSolar MPPT 150/85 CAN-bus” which are end-of-life since 2019. Legacy systems, historically installed with this configuration using the allow to charge contacts are not required to make any changes, see the legacy chapter below for details. | ||
| Line 345: | Line 345: | ||
| Even a single 100/20 48V MPPT charger unit with 2 x 60 cell solar panels would be sufficient to add this self correcting mechanism able to maintain the DC bus voltage and improve longterm system reliability considerably from accidental deep discharge and subsequent shut down. | Even a single 100/20 48V MPPT charger unit with 2 x 60 cell solar panels would be sufficient to add this self correcting mechanism able to maintain the DC bus voltage and improve longterm system reliability considerably from accidental deep discharge and subsequent shut down. | ||
| - | ===== 7. Example | + | ===== 7. Example |
| + | ng Diagram ===== | ||
| {{: | {{: | ||
| Line 374: | Line 375: | ||
| If its not visible, check: | If its not visible, check: | ||
| - | * [[venus-os: | + | * [[venus-os: |
| * BYD firmware version (see requirement above) | * BYD firmware version (see requirement above) | ||
| * CAN-bus communication cabling between BYD and Victron system. Make sure that it is in the right way around. If the special cable is plugged in reversed it won't work. | * CAN-bus communication cabling between BYD and Victron system. Make sure that it is in the right way around. If the special cable is plugged in reversed it won't work. | ||
| Line 417: | Line 418: | ||
| In general the ARM LED on the battery module has these meanings: | In general the ARM LED on the battery module has these meanings: | ||
| - | * Could be a temporary issue, that corrects self automatically after a short while (matter of minutes). | + | * Could be a temporary issue, that corrects self automatically after a short |
| + | while (matter of minutes). | ||
| * Could be an external issue, unacceptable voltage or current. | * Could be an external issue, unacceptable voltage or current. | ||
battery_compatibility/byd_b-box.txt · Last modified: by guy_stewart