Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
ac_coupling:start [2018-05-30 09:02] – [3.1 Lead batteries] mvader | ac_coupling:start [2019-03-30 05:56] – [5 Software configuration] mvader | ||
---|---|---|---|
Line 2: | Line 2: | ||
===== 1. Introduction to the AC-Coupling concept ===== | ===== 1. Introduction to the AC-Coupling concept ===== | ||
- | Already familiar with the concepts of AC-coupling and regulating PV inverter output power by frequency shifting? Skip to [[: | + | Already familiar with the concepts of AC-coupling and regulating PV inverter output power by frequency shifting? Skip to the requirements and limitations: |
+ | |||
+ | - [[: | ||
+ | - [[: | ||
+ | - [[: | ||
+ | |||
==== 1.1 What is AC-coupling? | ==== 1.1 What is AC-coupling? | ||
Line 26: | Line 32: | ||
- | ===== 2. The 1.0 rule: Max PV power must be equal or less than the VA rating of the Multi ===== | + | ===== 2. The Factor |
+ | **The max PV power must be equal or less than the VA rating of the inverter/ | ||
==== 2.1 Rule definition ==== | ==== 2.1 Rule definition ==== | ||
In both grid-connected and off-grid systems with PV inverters installed on the output of a Multi, Inverter or Quattro, there is a maximum of PV power that can be installed. This limit is called the __factor 1.0 rule__: 3.000 VA Multi = 3.000 Wp installed solar power. So for a 8.000 VA Quattro the maximum is 8.000 Wp, for two paralleled 8000 VA Quattros the maximum is 16.000 Wp, etc. | In both grid-connected and off-grid systems with PV inverters installed on the output of a Multi, Inverter or Quattro, there is a maximum of PV power that can be installed. This limit is called the __factor 1.0 rule__: 3.000 VA Multi = 3.000 Wp installed solar power. So for a 8.000 VA Quattro the maximum is 8.000 Wp, for two paralleled 8000 VA Quattros the maximum is 16.000 Wp, etc. | ||
Line 73: | Line 80: | ||
* 400 Ah accubank 12 Vdc | * 400 Ah accubank 12 Vdc | ||
- | ==== 4 Software configuration | + | ===== 4 Requirement of adding DC-Coupling - MPPT Solar Chargers ===== |
- | Multis and Quattros with factory settings will not shift the AC output frequency to regulate charge current. When setting up an AC Coupled system, install either the [[ess: | + | Not required for Energy Storage Systems in Germany or other reliable grid situations. |
+ | |||
+ | Required for offgrid systems as well as backup systems that need to overcome extended grid failures. | ||
+ | |||
+ | Reason: recover from deadlock situation of AC-Coupling only situation. | ||
+ | |||
+ | ===== 5 Software configuration ===== | ||
+ | |||
+ | Multis and Quattros with factory settings will not shift the AC output frequency to regulate charge current. When setting up an AC Coupled system, install either the [[ess: | ||
Other options, __all deprecated__, | Other options, __all deprecated__, | ||
Line 81: | Line 96: | ||
- Hub-4 Assistant in combination with the PV Inverter support Assistant | - Hub-4 Assistant in combination with the PV Inverter support Assistant | ||
- Use the Inverter period time settings on the Virtual switch tab. | - Use the Inverter period time settings on the Virtual switch tab. | ||
+ | |||
+ | ===== Monitoring ===== | ||
+ | |||
+ | See [[ccgx: | ||
+ | |||
===== DISQUS ===== | ===== DISQUS ===== | ||