User Tools

Site Tools


ac_coupling:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
ac_coupling:start [2018-02-02 13:00] – [2.1 Rule definition] justinac_coupling:start [2018-06-21 08:14] – [4 Software configuration] mvader
Line 62: Line 62:
  
 ==== 3.1 Lead batteries ==== ==== 3.1 Lead batteries ====
-1 kWp installed PV power requires:+1 kWp installed PV power requires approximately 5kWh of battery:
   * 100 Ah accubank 48 Vdc   * 100 Ah accubank 48 Vdc
   * 200 Ah accubank 24 Vdc   * 200 Ah accubank 24 Vdc
Line 75: Line 75:
 ==== 4 Software configuration ==== ==== 4 Software configuration ====
  
-Multis and Quattros with factory settings will not shift the AC output frequency to regulate charge current. When setting up an AC Coupled system, install either the [[ess:start|ESS Assistant]] (for grid-connected systems) or the PV Inverter Support Assistant (for off-grid systems).+Multis and Quattros with factory settings will not shift the AC output frequency to regulate charge current. When setting up an AC Coupled system, install either the [[ess:start|ESS Assistant]] (for grid-connected systems) or the [[:assistants:pv-inverter-support]] (for off-grid systems).
  
 Other options, __all deprecated__, are: Other options, __all deprecated__, are:
ac_coupling/start.txt · Last modified: 2022-04-12 06:47 by bob

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki