Appendix A. Connection overview

A | Load connection AC out2 - From left to right: N (neutral), L2 (phase 2), PE (earth/ground), L1 (phase 1) | |
B | Load connection AC out1 - From left to right: N (neutral), L2 (phase 2), PE (earth/ground), L1 (phase 1) | |
C | AC input - From left to right: N (neutral), L2 (phase 2), PE (earth/ground), L1 (phase 1) | |
D | Auxiliary relay - From left to right: NO, NC, COM | |
E | Primary ground connection (PE) - M8 bolt | |
F | Trickle charge positive terminal (12 and 24V model only) | |
G | Battery positive connections - 2 x M8 bolt | |
H | Battery minus connections - 2 x M8 bolt | |
I | Power switch - To switch: 1=On, 0=Off, ||=charger only | |
J | Push button A - To perform a startup without assistants | |
K | Remote on/off connector - Short contact to switch to “on” | |
L | VE.Bus connectors - 2x RJ45: For remote control and/or parallel / three-phase operation | |
M | External current sensor To connect the current sensor; remove the wire bridge between the INT and COM terminals, connect the red sensor wire to the EXT terminal and connect the white sensor wire to the COM terminal. | |
N | I/O Terminal, from top to bottom:
|