ve.bus:solar-and-wind-priority
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
ve.bus:solar-and-wind-priority [2023-09-12 11:37] – mvader | ve.bus:solar-and-wind-priority [2024-02-06 16:49] (current) – jpasop | ||
---|---|---|---|
Line 13: | Line 13: | ||
For systems with a permanent utility connection, such as houses, farms and other stationary systems, we have a different solution: [[https:// | For systems with a permanent utility connection, such as houses, farms and other stationary systems, we have a different solution: [[https:// | ||
+ | |||
+ | \\ | ||
+ | {{youtube> | ||
+ | |||
===== 2. Details and requirements ===== | ===== 2. Details and requirements ===== | ||
Line 26: | Line 30: | ||
* The feature works purely on voltage, making it simple, robust and effective. It does not require an integration with battery monitors, GX devices or central control mechanisms such as DVCC. | * The feature works purely on voltage, making it simple, robust and effective. It does not require an integration with battery monitors, GX devices or central control mechanisms such as DVCC. | ||
* Generator support: the system will automatically detect that a generator is running; and then charge at full power as usual. For Quattros, it requires the generator to be wired to the AC-in-1 input. And in case of Multis with an external transfer switch wired in front of it, the GX device can be used to detect if the generator is active (with a digital input) and pass that information along to the Multi. When using a Digital Multi Control panel (DMC), closing the generator select input, terminals of screw connector on backside, the system will charge at full power also. | * Generator support: the system will automatically detect that a generator is running; and then charge at full power as usual. For Quattros, it requires the generator to be wired to the AC-in-1 input. And in case of Multis with an external transfer switch wired in front of it, the GX device can be used to detect if the generator is active (with a digital input) and pass that information along to the Multi. When using a Digital Multi Control panel (DMC), closing the generator select input, terminals of screw connector on backside, the system will charge at full power also. | ||
+ | * On a Quattro AC-in-2 should be used for the shore power connection. | ||
* The Solar and Wind priority mode works both for systems with a managed battery, where a BMS is managing the charge process (DVCC), as well as systems using lead batteries, or Lithium drop-ins, where the inverter/ | * The Solar and Wind priority mode works both for systems with a managed battery, where a BMS is managing the charge process (DVCC), as well as systems using lead batteries, or Lithium drop-ins, where the inverter/ | ||
Line 71: | Line 76: | ||
===== 4. User instructions ===== | ===== 4. User instructions ===== | ||
- | Youtube video with full user instructions will be released on Sept 14th latest. | + | \\ |
+ | {{youtube> | ||
ve.bus/solar-and-wind-priority.1694511437.txt.gz · Last modified: 2023-09-12 11:37 by mvader