User Tools

Site Tools


ve.bus:skip-absorption

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
ve.bus:skip-absorption [2023-06-18 08:41] – [Solar and wind priority] mvaderve.bus:skip-absorption [2023-07-28 17:25] (current) mvader
Line 1: Line 1:
-===== Solar and wind priority =====+[[solar-and-wind-priority|moved here]]
  
-NOTE: this is a new feature that is being rolled out in steps: 
- 
-  - VE.Bus Firmware, implement float-only feature - done per version 26/27xx504 
-  - VEConfigure, add float-only config option - pending. Expected late June 2023. 
-  - VictronConnect, add float-only setting & add user control to override it in case a full charge from shore is needed - pending 
-  - Venus OS, add user control to override it in case a full charge from shore is needed - pending 
-  - VRM Dashboard controls, same - pending. 
- 
-In other words, per late June 2023, it is possible to use this feature. A while later, hopefully already in July, we’ll have added the user option to - temporarily - override it for moments when a full charge from shore is required. 
- 
- 
-==== 1. Feature description ==== 
- 
-In VEConfigure, there is a new setting, “limit internal charger to prioritize other energy sources”. 
- 
-Enabling that will make the inverter/charger use mains/shore power to charge up to the configured float voltage only. Instead of up to the, higher, configured  absorption voltage. 
- 
-This charges the battery enough to prevent premature ageing, while at the same time leaving the rest of the charge up to renewable sources, such as wind or solar. 
- 
-When after seven days the battery still isn’t fully charged, the inverter/charger will complete one charge cycle. These seven days are configurable, it is the repeated absorption interval setting. 
- 
-The intended application is boats, campers, and so forth that want their solar charger to take care of most of charging when connected to shore power; both while traveling but also when back home.​ 
- 
-For systems with a Quattro, the charge-to-float will only be applied to AC-in-2, the input where we recommend to wire shore. When charging from AC-in-1, recommended to wire the generator, it will make for a full charge. This AC input selection is not configurable. To prioritize solar over charging from the generator, look at options to start the generator early. 
- 
-==== 2. Config instructions ==== 
- 
-TO BE COMPLETED 
- 
-Step 1 Requirements 
-- update VE.Bus firmware to 504 or higher. 
- 
-===  
-- if the Storage setting is enabled, then after 12 hours of float, the system will go to storage​ 
- 
-==== 3. Alternative: disconnect from shore automatically ==== 
- 
-Mostly applicable for larger systems, where the size of the installed inverter is sufficient to power all the loads, there is an alternative solution. 
- 
-By using the “Conditonal AC input control” / “Ignore AC input” feature, the Multi or Quattro can be configured to remain disconnected from the shore connection completely. This is described in detail in [[https://panbo.com/maximizing-solar-production-with-victron-gx/ |this blogpost on Panbo.com]] 
ve.bus/skip-absorption.1687070511.txt.gz · Last modified: 2023-06-18 08:41 by mvader

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki