ve.bus:skip-absorption
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| ve.bus:skip-absorption [2023-06-18 08:41] – [Solar and wind priority] mvader | ve.bus:skip-absorption [2023-07-28 17:25] (current) – mvader | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ===== Solar and wind priority | + | [[solar-and-wind-priority|moved here]] |
| - | NOTE: this is a new feature that is being rolled out in steps: | ||
| - | |||
| - | - VE.Bus Firmware, implement float-only feature - done per version 26/27xx504 | ||
| - | - VEConfigure, | ||
| - | - VictronConnect, | ||
| - | - Venus OS, add user control to override it in case a full charge from shore is needed - pending | ||
| - | - VRM Dashboard controls, same - pending. | ||
| - | |||
| - | In other words, per late June 2023, it is possible to use this feature. A while later, hopefully already in July, we’ll have added the user option to - temporarily - override it for moments when a full charge from shore is required. | ||
| - | |||
| - | |||
| - | ==== 1. Feature description ==== | ||
| - | |||
| - | In VEConfigure, | ||
| - | |||
| - | Enabling that will make the inverter/ | ||
| - | |||
| - | This charges the battery enough to prevent premature ageing, while at the same time leaving the rest of the charge up to renewable sources, such as wind or solar. | ||
| - | |||
| - | When after seven days the battery still isn’t fully charged, the inverter/ | ||
| - | |||
| - | The intended application is boats, campers, and so forth that want their solar charger to take care of most of charging when connected to shore power; both while traveling but also when back home. | ||
| - | | ||
| - | For systems with a Quattro, the charge-to-float will only be applied to AC-in-2, the input where we recommend to wire shore. When charging from AC-in-1, recommended to wire the generator, it will make for a full charge. This AC input selection is not configurable. To prioritize solar over charging from the generator, look at options to start the generator early. | ||
| - | |||
| - | ==== 2. Config instructions ==== | ||
| - | |||
| - | TO BE COMPLETED | ||
| - | |||
| - | Step 1 Requirements | ||
| - | - update VE.Bus firmware to 504 or higher. | ||
| - | |||
| - | === | ||
| - | - if the Storage setting is enabled, then after 12 hours of float, the system will go to storage | ||
| - | |||
| - | ==== 3. Alternative: | ||
| - | |||
| - | Mostly applicable for larger systems, where the size of the installed inverter is sufficient to power all the loads, there is an alternative solution. | ||
| - | |||
| - | By using the “Conditonal AC input control” / “Ignore AC input” feature, the Multi or Quattro can be configured to remain disconnected from the shore connection completely. This is described in detail in [[https:// | ||
ve.bus/skip-absorption.1687070511.txt.gz · Last modified: by mvader