ve.bus:manual_parallel_and_three_phase_systems
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| ve.bus:manual_parallel_and_three_phase_systems [2026-02-12 14:10] – jpasop | ve.bus:manual_parallel_and_three_phase_systems [2026-03-04 09:34] (current) – [Communication wiring] guy_stewart | ||
|---|---|---|---|
| Line 98: | Line 98: | ||
| ===== Communication wiring ===== | ===== Communication wiring ===== | ||
| - | * All units must be daisy chained with the VE.Bus cable (RJ-45 | + | * All units must be daisy chained with the VE.Bus cable (RJ-45 |
| * The temperature sensor can be wired to any unit in the system. For a large battery bank it is possible to wire multiple temperature sensors. The system will use the one with the highest temperature to determine the temperature compensation. | * The temperature sensor can be wired to any unit in the system. For a large battery bank it is possible to wire multiple temperature sensors. The system will use the one with the highest temperature to determine the temperature compensation. | ||
| * Wire the voltage sense on the master of L1.\\ (If the system has more than 1 AC input, connect it to the Master corresponding to the first AC input.) \\ All other units ignore their voltage sense input and receive the voltage sense value from the L1 master. | * Wire the voltage sense on the master of L1.\\ (If the system has more than 1 AC input, connect it to the Master corresponding to the first AC input.) \\ All other units ignore their voltage sense input and receive the voltage sense value from the L1 master. | ||
| + | * [[https:// | ||
| ===== Configuration ===== | ===== Configuration ===== | ||
ve.bus/manual_parallel_and_three_phase_systems.1770901809.txt.gz · Last modified: by jpasop