ve.bus:manual_parallel_and_three_phase_systems [2020-05-11 02:39] – [DC and AC wiring] mleeftinkve.bus:manual_parallel_and_three_phase_systems [2020-11-07 13:44] – [Assistants] guy_stewart
Line 74: Line 74:
 ==== Theory and background information ====  ==== Theory and background information ==== 
  
-wiring is further explained in these presentations:+Wiring is further explained here:
   * {{:ve.bus:4._ripple_in_a_ac_battery_system.pdf|presentation - DC Ripple}}   * {{:ve.bus:4._ripple_in_a_ac_battery_system.pdf|presentation - DC Ripple}}
   * {{:ve.bus:rva_-_theory_on_wiring_large_systems.pdf|presentation - Theory on wiring large systems}}'   * {{:ve.bus:rva_-_theory_on_wiring_large_systems.pdf|presentation - Theory on wiring large systems}}'
Line 124: Line 124:
   * If you are using a self-consumption assistant, such as ESS, Hub-1 to Hub-4, the assistant will need to be loaded into each unit in the system individually.\\    * If you are using a self-consumption assistant, such as ESS, Hub-1 to Hub-4, the assistant will need to be loaded into each unit in the system individually.\\ 
   * PV Inverter Assistant needs to be loaded into each unit in the system.   * PV Inverter Assistant needs to be loaded into each unit in the system.
-  * The VE.Bus BMS and the Two-Signal BMS support Assistant also need to be loaded in each unit in the system. +  * The VE.Bus BMS and the Two-Signal BMS support Assistant also need to be loaded in each unit in the system individually. Program each Multi separately.  
-(nb: In some cases (depending on the choices made) slaves can be left out, the assistant will notify you about this.)+  * For the [[https://www.victronenergy.com/upload/documents/Manual-Connecting-other-lithium-battery-systems-to-Multis-and-Quattros-EN.pdf|Two-Signal BMS assistant]]during the first Multi setup there are questions about which Aux connection ports the BMS is connected. When setting up the second and third Multi assistant setup, you choose that BMS is connected to "other" Multi, and the setup will end. Only the unit that is physically wired to the BMS will be set up fully with the options selected matching the physical hardware interface connections.
  
 With all the other Assistants: genset start/stop, relay locker etcetera, a unique configuration can be made in each unit. With all the other Assistants: genset start/stop, relay locker etcetera, a unique configuration can be made in each unit.
  
-Tip: a quick way to load Assistants into each unit in the system is to save the settings after configuring the master in L1. Then open VEConfigure for another unit and load that file. VEConfigure will automatically adapt the Assistants for the slaves. (note: In some cases you might get some warnings. Please step through the assistant in that case.)+Tip: a quick way to load Assistants into each unit in the system is to save the settings after configuring the master in L1. Then open VEConfigure for another unit and load that file. VEConfigure will automatically adapt the Assistants for the slaves. (note: In some cases you might get some warnings. Please step through the assistant individually in that case.)
 ===== Tips and hints ===== ===== Tips and hints =====
   * {{:ve.bus:4._ripple_in_a_ac_battery_system.pdf|presentation - DC Ripple}}   * {{:ve.bus:4._ripple_in_a_ac_battery_system.pdf|presentation - DC Ripple}}
Line 143: Line 143:
 ===== Training Video ===== ===== Training Video =====
  
-There is an advanced training video and competency exam for 3 phase and parallel installation and commissioning available on [[https://professional.victronenergy.com|Victron Professional -> Online Training.]] You will require an installer account on Victron Professional to access it.+There is an advanced training video and competency exam for 3 phase and parallel installation and commissioning available on [[https://professional.victronenergy.com/online-training|Victron Professional -> Online Training.]] You will require an installer account on Victron Professional to access it.
  
  