ve.bus:manual_parallel_and_three_phase_systems [2019-02-09 03:09]
127.0.0.1 external edit
ve.bus:manual_parallel_and_three_phase_systems [2019-06-28 09:01]
simonhackett [Configuration]
Line 64: Line 64:
  
 ===== Configuration ===== ===== Configuration =====
 +
 +Note: Special considerations exist before initial power-up for large systems using Redflow batteries: [[https://​redflow.zendesk.com/​hc/​en-us/​articles/​360029645212|Click here for details]].
 +
 In the [[https://​www.victronenergy.com/​support-and-downloads/​software#​ve-configuration-tools-for-ve-bus-products|VE Configuration tools]] there are two different programs. One to configure small systems and  one for larger systems: In the [[https://​www.victronenergy.com/​support-and-downloads/​software#​ve-configuration-tools-for-ve-bus-products|VE Configuration tools]] there are two different programs. One to configure small systems and  one for larger systems:
   * Up to three units: use VE.Bus Quick Configure ​   * Up to three units: use VE.Bus Quick Configure ​
Line 87: Line 90:
  
 Note that AES is only operational in stand-alone systems. Not in parallel and multi-phase systems. Note that AES is only operational in stand-alone systems. Not in parallel and multi-phase systems.
- 
 ==== Virtual switch ==== ==== Virtual switch ====
 A unique virtual switch configuration can be configured for each unit in the system. With the exception of the Ignore AC input function: configure that in the master of L1. A unique virtual switch configuration can be configured for each unit in the system. With the exception of the Ignore AC input function: configure that in the master of L1.