User Tools

Site Tools


playground:playground

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
playground:playground [2015-10-16 13:25] arnekaasplayground:playground [2024-02-09 09:30] (current) – created - external edit 127.0.0.1
Line 1: Line 1:
-start with a smile every day: =+====== PlayGround ======
-Then have a cup of tea: 8-) +
-creat a list: +
-  - 1234 +
-  - 5678 +
-  - 910 +
- +
-**keep on playing...** +
- +
-A new topic by Arne Kaas: "Creating a redundant and low-stand-by system" +
----- +
- +
-Hi Mathijs and Johannes, +
- +
-I've got some questions on how to make a 3 phase system redundant and more efficient by reducing stand-by power. +
- +
-**Redundancy**: Can I install a 3 phase system with 6 quatro's/multies that will remain on, even if one of the six inverters will fail? Is it possible to connected 2 x a 3phase system with master and slave, where the slave will automatically become a master if the real master (3 fase system) fails?  +
- +
-**Less standby power**:  +
-Looking at the standby power of a 3 fase system with 6 quatro's/multi's. It is possible to 'sleep' the second 3phase system at lower powers? +
-//With aux-relais and a power assistant I've already done this on Pampus, but this was complicated to setup and uses a lot op stand-by power. And if one of the six quatro's fail, I will still have a black-out. +
-// +
- +
- +
-Looking at the standby power of a 3 fase system with 3 quatro's/multi's. It is possible to 'sleep' 1 or 2 of three fase setup at lower powers or time windows? Like in the 'Nullust in Search modus (W)'?+
  
playground/playground.1444994744.txt.gz · Last modified: 2015-10-16 13:25 by arnekaas

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki