-===== 1.5 Loss of mains detection (LOM) =====+===== 1.5 Loss of mains detection (LOM) (Only applicable to ESS systems) ===== 
 + 
 +This part is only applicable on systems where a grid-code is selected (generally only ESS systems) on an off-grid system a grid code should not be used and in the selection box for grid code, 'none' should be selected.
  
 Loss of mains detection will push and pull at voltage and frequency to see if there is still a generating source. This process can cause issues with some generators, or high impedance connections to generators.  Loss of mains detection will push and pull at voltage and frequency to see if there is still a generating source. This process can cause issues with some generators, or high impedance connections to generators. 
Line 196: Line 198:
 If you have a small generator and have trouble getting connected or staying connected, Disable PowerAssist to allow the device to reduce the AC input current limit.  If you have a small generator and have trouble getting connected or staying connected, Disable PowerAssist to allow the device to reduce the AC input current limit. 
  
 +====== 5. Generator control in 3 phase and parallel systems ======
 +
 +There is some specific and non-intuitive conditions when setting AC input current limits, and Charge Current limits for Large systems that involve more than one MultiPlus, and/or a GX device.
 +
 +Those specific details are articulated here:
 +https://www.victronenergy.com/live/ve.bus:manual_parallel_and_three_phase_systems#configuration
 +
 +Described in the online training theory here:
 +@ 38 minutes and 43 seconds - https://professional.victronenergy.com/online-training/20/
  
 +Demonstrated in the 3 phase installation training here:
 +@ 25 minutes - https://professional.victronenergy.com/online-training/21/
  
 ====== Still not connecting? ====== ====== Still not connecting? ======
Line 250: Line 263:
  
  
-===== DISQUS ===== 
-~~DISQUS~~ 
multiplus_faq.1663633460.txt.gz · Last modified: 2022-09-20 02:24 by guystewart

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki