ess:design-installation-manual
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
ess:design-installation-manual [2020-07-29 15:37] – [7.2 Three-phase ESS] marmour | ess:design-installation-manual [2020-08-03 23:57] – [4.3 GX device - ESS Settings] simonhackett | ||
---|---|---|---|
Line 347: | Line 347: | ||
* Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing | * Victron 12.8V Lithium batteries, and other lithium batteries that have passive cell balancing | ||
- | Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled | + | Because it makes no sense to leave a battery discharged, without reserve power in case of mains failure, we recommend leaving BatteryLife enabled |
- | * Lithium with active cell balancing | + | Redflow specifies that BatteryLife should be disabled in [[battery_compatibility: |
- | * [[battery_compatibility: | + | |
- | + | ||
- | However, BatteryLife //can// be disabled in these cases. | + | |
=== 4.3.2 Grid meter installed === | === 4.3.2 Grid meter installed === |
ess/design-installation-manual.txt · Last modified: 2021-01-14 08:35 by marmour