ess:design-installation-manual [2019-04-05 12:21] guy_stewartess:design-installation-manual [2019-07-01 13:23] – [4.3 Venus-device - ESS Settings] mvader
Line 349: Line 349:
  
 Set to 'On' to make the Solar Charger always operates at its maximum power point. The first priority is powering the loads, and the second priority is to charge the battery. If more power is available when those two priorities are met, then that power will be fed to the utility grid. Set to 'On' to make the Solar Charger always operates at its maximum power point. The first priority is powering the loads, and the second priority is to charge the battery. If more power is available when those two priorities are met, then that power will be fed to the utility grid.
 +
 +Please note that when enabling this option, the DVCC charge current limit configured under Settings -> Limit charge current won't be active. The Solar charger will operate at full power for maximum feed-in into the grid. It's advisable to configure a safe limit on the solar chargers when used with a small battery bank.
  
 === 4.3.5 Phase compensation === === 4.3.5 Phase compensation ===
Line 406: Line 408:
  
 Use the __Fronius Zero feed-in active__ menu item to double check that all above criteria are met. It will show **No** if the firmware requirement; the Data export; or the Sunspec Model type settings are incorrect. Use the __Fronius Zero feed-in active__ menu item to double check that all above criteria are met. It will show **No** if the firmware requirement; the Data export; or the Sunspec Model type settings are incorrect.
 +
 +Do not use a Fronius Smart Meter for limiting export when part of a Victron ESS System. More details about when a Fronius Smart Meter can, and can not be used is explained [[ac_coupling:fronius|here]].
  
 === 4.3.12 Grid setpoint === === 4.3.12 Grid setpoint ===
Line 606: Line 610:
 (This 0.1 V is the threshold for 12 V systems; for 24 V the threshold is 0.2 V above; and for 48 V it is 0.4V above.) (This 0.1 V is the threshold for 12 V systems; for 24 V the threshold is 0.2 V above; and for 48 V it is 0.4V above.)
  
-==== 6.5 ESS Battery Status Code Numbers ====+==== 6.5 ESS Battery Status Reason Code Numbers ====
  
 In addition to the charger states (Bulk/Absorption/Float), there are additional Discharging and Sustain codes that provide at-a-glance information on the Pages Overview of GX display.  In addition to the charger states (Bulk/Absorption/Float), there are additional Discharging and Sustain codes that provide at-a-glance information on the Pages Overview of GX display. 