Line 6: Line 6:
  
 ===== 1. Selection guide ===== ===== 1. Selection guide =====
 +
 +^ __Energy Meter__ ​      ​^ ​ ET112    ^  ET340                              ^  EM24  ^  ​
 +| Appearance ​  ​| ​ {{:​energy-meters:​energy_meter_et112_right_.png?​direct&​100|}} ​    ​| ​ {{:​energy-meters:​energy_meter_et340_right_.png?​direct&​100|}} ​                       |  {{:​1449135894_upload_products_555_1000-342_20151203104454.png?​direct&​100|}} ​ | 
 +| Display ​ |  no display ​    ​| ​ no display ​ |  LCD Display ​ | 
 +| Manual and Wiring Diagrams |  [[et112|ET112 Manual]] ​    ​| ​ [[et340|ET340 Manual ​ ]]  |  [[em24|EM24 Manual ]]  | 
 +| Part Number |  REL300100000 ​ |  REL300300000 ​ | REL200100000 |
 +| Supported Phases |  1 phase  |  3 phase  |  3 phase  | 
 +| Maximum Current Rating |  100A  |  65A per phase  |  65A per phase  |
 +| Measurement Type |  Shunt  |  Shunt  |  Shunt  |
  
 === First decide if you need single- or three phase meters === === First decide if you need single- or three phase meters ===
Line 12: Line 21:
  
 === Now, based on current, select the model === === Now, based on current, select the model ===
-^ Requirement ​                      ^ Type  ^ Solution ​                                        ^^^ +^ Requirement ​                      ^ Type  ^ Model / Solution ​                               
-^ :::                               ^ :::   ^ Part number ​ ^ Model ^ Specs                       ^  +| Single phase up to 100A           | Shunt | ET112 |  
-| Single phase up to 100A           | Shunt | REL300100000 ​| ET112 | 1 phase - max 100A          ​+| Three phase up to 65A/​phase ​      | Shunt | EM24/​ET340* ​ |  
-| Three phase up to 65A/​phase ​      | Shunt | REL200100000 ​| EM24  ​| 3 phase - max 65A/​phase ​    +| Single phase more than 100A/phase | CT    | Not available, use the three phase CT solution ​                     | 
-| Single phase more than 100A/phase | CT    | Not available, use the three phase CT solution ​                     ​||+| Three phase more than 65A/​phase ​  | CTs   | Carlo Gavazzi EM24DINAV53DISX (see FAQ Q8)       |
-| Three phase more than 65A/​phase ​  | CTs   | Carlo Gavazzi EM24DINAV53DISX (see FAQ Q8)       |||+
  
-Besides above meters, we also stock the ET340 meter; REL300300000. It counts energy in a different way than the EM24. For Germany and most other countries; the EM24 is the advised model. See FAQ Q5 and Q9 for details.+The EM24 meter counts energy in a different way than the ET340. For Germany and most other countries; the EM24 is the advised model. See FAQ Q5 and Q9 for further ​details.
  
 === 1.1 Support for other Carlo Gavazzi meters === === 1.1 Support for other Carlo Gavazzi meters ===
Line 35: Line 43:
 ^ EM271    | Not supported | does not report exported energy, ​                            | ^ EM271    | Not supported | does not report exported energy, ​                            |
 ^ :::      | :::           | com protocol not compatible with supported grid meters ​      | ^ :::      | :::           | com protocol not compatible with supported grid meters ​      |
- 
-===== 2. Manuals ===== 
- 
-  * [[et112|REL300100000 - ET112 - 1 phase - max 100A]] 
-  * [[et340|REL300300000 - ET340 - 3 phase max 65A/phase]] 
-  * [[em24|REL200100000 - EM24 - 3 phase max 65A/phase]] 
  
  
Line 68: Line 70:
  
 Three-phase new meter only (ET340): Three-phase new meter only (ET340):
-  * Measuring Energy from single phase PV Inverter on the second phase of the new meter, ET340, actually works. Where-as with the old meter, the EM24, only the Power Metering (Watts) works. The Energy Metering (kWh) for a single phase PV Inverter on the second phase of the EM24 does not work.+  * Measuring Energy from single phase PV Inverter on the second phase of the new meter, ET340, actually works. Where-as with the old meter, the EM24, only the Power Metering (Watts) works. The Energy Metering (kWh) for a single phase PV Inverter on the second phase of the EM24 does not work. See Q9 for the details.
  
 === Q6: Will you keep shipping both 3 phase meters? (ET340 & EM24) === === Q6: Will you keep shipping both 3 phase meters? (ET340 & EM24) ===
energy-meters/start.1565866176.txt.gz · Last modified: 2019-08-15 12:49 by guy_stewart