energy-meters:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
energy-meters:start [2019-10-10 11:22] – guy_stewart | energy-meters:start [2020-08-13 02:56] – guy_stewart | ||
---|---|---|---|
Line 10: | Line 10: | ||
| Appearance | | Appearance | ||
| Display | | Display | ||
- | | Manual and Wiring Diagrams | [[et112|ET112 Manual]] | + | | Manual and Wiring Diagrams* | [[et112|ET112 Manual]] |
| Part Number | REL300100000 | | Part Number | REL300100000 | ||
| Supported Phases | 1 phase | 3 phase | 3 phase | | | Supported Phases | 1 phase | 3 phase | 3 phase | | ||
| Maximum Current Rating | 100A | 65A per phase | 65A per phase | | | Maximum Current Rating | 100A | 65A per phase | 65A per phase | | ||
| Measurement Type | Shunt | Shunt | Shunt | | | Measurement Type | Shunt | Shunt | Shunt | | ||
+ | |||
+ | * Including RS485 to GX device instructions. | ||
=== First decide if you need single- or three phase meters === | === First decide if you need single- or three phase meters === |
energy-meters/start.txt · Last modified: 2022-09-13 14:42 by stefanie