=== Single phase dual function === | === Single phase dual function === | ||
- | If you wish to use a three phase meter in a single phase installation to measure the grid on one input and PV inverter output on another phase, use the ET340 instead. See [[energy-meters: | + | If you wish to use a three phase meter in a single phase installation to measure the grid on one input and PV inverter output on another phase, use the ET340 instead. See [[energy-meters: |
If you understand the limitations of this meter in this configuration and wish to proceed anyway, see this diagram - {{ : | If you understand the limitations of this meter in this configuration and wish to proceed anyway, see this diagram - {{ : |