energy-meters:em24

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
energy-meters:em24 [2018-12-10 16:33] – [1. Introduction and usage] justin_tyers_live_a_cenergy-meters:em24 [2019-01-22 10:16] – external edit 127.0.0.1
Line 7: Line 7:
 This document is the manual for the EM24 three phase max 65 A per phase Energy Meter. As shown in the picture above. This document is the manual for the EM24 three phase max 65 A per phase Energy Meter. As shown in the picture above.
  
-https://www.victronenergy.com/accessories/wired-ac-sensor+The Energy Meter can be used as a:
  
-The Energy Meter can be used for four things: +  - Grid meter, and used as control input for an [[assistants:ess-assistant|ESS System]].
- +
-  - Grid meter, and used as control input for an [[assistants:ess-assistant|ESS System]] (1).+
   - Measure the output of a PV Inverter   - Measure the output of a PV Inverter
   - Measure the output of a AC Genset   - Measure the output of a AC Genset
   - (deprecated) <del>Grid meter, used as control input for a [[system_integration:hub4_grid_parallel|Hub-4 system]]</del>   - (deprecated) <del>Grid meter, used as control input for a [[system_integration:hub4_grid_parallel|Hub-4 system]]</del>
- 
-(1) In case the meter is used as a grid meter in a single phase installation, it is possible to use the second phase to measure the output of a PV Inverter. Note that this does not work properly, use the ET340 instead. See [[energy-meters:start#faq|Energy Meters FAQ, Q5]] for details. 
  
 The meter is connected to the Color Control GX. There are two options in its wiring: The meter is connected to the Color Control GX. There are two options in its wiring:
Line 22: Line 18:
   - Direct connection, either using the RS485 to USB interface with 1.8m cable length, or the 5.0m cable.   - Direct connection, either using the RS485 to USB interface with 1.8m cable length, or the 5.0m cable.
   - Wireless connection via Zigbee   - Wireless connection via Zigbee
 +
 +If you are wondering which Energy Meter you should use, please read the [[energy-meters:start|Energy Meters Start]] page and [[https://www.victronenergy.com/accessories/wired-ac-sensor|Energy Meter Product page]].
  
 The REL200100000 is the EM24DINAV93XISX from Carlo Gavazzi. Other EM24 models from Carlo Gavazzi can also be used, as the communication is the same. For example the EM24DINAV53DISX, which uses Current Transformers and can therefore work in systems > 63A per phase, has been tested and works. Note that this model is not stocked by Victron Energy, we recommend to purchase it locally. The REL200100000 is the EM24DINAV93XISX from Carlo Gavazzi. Other EM24 models from Carlo Gavazzi can also be used, as the communication is the same. For example the EM24DINAV53DISX, which uses Current Transformers and can therefore work in systems > 63A per phase, has been tested and works. Note that this model is not stocked by Victron Energy, we recommend to purchase it locally.
 +
 +
 +
 ===== 2. AC Wiring and front selector ===== ===== 2. AC Wiring and front selector =====
  
Line 31: Line 32:
 When used to measure a PV Inverter, terminals 1, 4 and 7 should face the PV inverter to ensure correct direction of current and power. When used to measure a PV Inverter, terminals 1, 4 and 7 should face the PV inverter to ensure correct direction of current and power.
  
-=== single phase single function diagram: ===+=== Single phase single function diagram: ===
 Note the jumper between terminals 1 and 4. You do not need this connection if you have the version AV2 of the sensor: Note the jumper between terminals 1 and 4. You do not need this connection if you have the version AV2 of the sensor:
  
Line 40: Line 41:
 To measure a single phase PV inverter in a 3-phase system, connect all 3 phases to the grid phasing terminals (3, 6 and 9). Now you can chose on which phase you want the PV inverter by connecting the L1 line of the PV inverter to terminal 1, 4 or 7. To measure a single phase PV inverter in a 3-phase system, connect all 3 phases to the grid phasing terminals (3, 6 and 9). Now you can chose on which phase you want the PV inverter by connecting the L1 line of the PV inverter to terminal 1, 4 or 7.
  
-=== single phase dual function diagram: ===+=== Single phase dual function ===
  
-In this diagram, single meter is used to both measure the grid and a single phase PV Inverter. +If you wish to use three phase meter in a single phase installation to measure the grid on one input and PV inverter output on another phase, use the ET340 instead. See [[energy-meters:start#faq|Energy Meters FAQ, Q5]] for more details.
- +
-{{:power_meter_1phase+pv_dec2016.png?nolink&300}} +
- +
-On the CCGX go to the grid meter in the Wired AC sensor settings. Make sure 'Phase type' is set to 'Single phase' and 'PV inverter on phase 2' is enabled.+
  
 +If you understand the limitations of this meter in this configuration and wish to proceed anyway, see this diagram - {{ :power_meter_1phase_pv_dec2016.png?linkonly |}}
  
 === Front selector === === Front selector ===
Line 123: Line 121:
  
 Note that only one extra Energy meter can be added: the systems works only with address 1 (the default) and 2. Note that only one extra Energy meter can be added: the systems works only with address 1 (the default) and 2.
 +
 +==== Note on Operation ====
 +
 +
 +
 +