ccgx:start [2019-10-10 16:35] guy_stewartccgx:start [2019-10-23 12:09] – [5.6 Remote Console on VRM - Trouble shooting] mvader
Line 569: Line 569:
 The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode. The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode.
  
-The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''.+The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''. Or reprogram the Multis and modify the phase assigned to match the wiring
  
 On the GX device itself, the warning will be popup as a notification on the GUI: On the GX device itself, the warning will be popup as a notification on the GUI:
Line 870: Line 870:
   - In VictronConnect, use the GX Log Converter feature to convert them to Excel sheets.   - In VictronConnect, use the GX Log Converter feature to convert them to Excel sheets.
  
-==== 5.6 Remote Console on VRM ====+==== 5.6 Remote Console on VRM - Setup ====
  
 This feature allows full remote control of a GX Device, over the internet: This feature allows full remote control of a GX Device, over the internet:
Line 884: Line 884:
 {{ :vrm_portal:vrm_remote_console.jpg?direct }} {{ :vrm_portal:vrm_remote_console.jpg?direct }}
  
-Trouble shooting tips:+==== 5.7 Remote Console on VRM - Trouble shooting ====
  
-  - Make sure that basic communication with VRM works, see chapter 5.4. +Follow these steps to trouble shoot Remote Console on VRM 
-  - After enabling the feature, make sure to set (or disable) the password. + 
-  - Also make sure to restart the CCGX.+  - Make sure that Logging to the VRM portal works, see chapter 5.4. Without this; Remote Console on VRM will not work
 +  - After enabling the Remote Console feature, make sure to set (or disable) the password. 
 +  - Also make sure to restart the CCGX after setting (or disabling) the password.
   - Make sure to update the CCGX to the latest firmware version. The last stability improvement for Remote Console was made in version v2.30.   - Make sure to update the CCGX to the latest firmware version. The last stability improvement for Remote Console was made in version v2.30.
   - After the restart, check the Remote Console on VRM status shows online or a port number. In case it says offline, or port number 0, the CCGX was unable to connect to the Remote Console server. This is normally caused by a (company) firewall, blocking the connection. The solution is then to configure an exception rules in the firewall.   - After the restart, check the Remote Console on VRM status shows online or a port number. In case it says offline, or port number 0, the CCGX was unable to connect to the Remote Console server. This is normally caused by a (company) firewall, blocking the connection. The solution is then to configure an exception rules in the firewall.
Line 912: Line 914:
   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.
   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.
-  * Monitor solar production from an MPPT.+  * Monitor solar production from an MPPT Solar Charger.
   * Monitor AC loads, and DC loads.   * Monitor AC loads, and DC loads.
   * Control shore power input current limit.   * Control shore power input current limit.
Line 918: Line 920:
   * Optionally open the Victron Remote Console panel; allowing access to further parameters.   * Optionally open the Victron Remote Console panel; allowing access to further parameters.
  
-Power equipment compatibility:+Victron equipment compatibility:
   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.
   * Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS.   * Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS.
   * All Victron MPPT Solar Charge Controllers   * All Victron MPPT Solar Charge Controllers
  
-Requirements:+Required components:
   * Battery system.   * Battery system.
   * Victron inverter/charger.   * Victron inverter/charger.
Line 932: Line 934:
 ==== 6.2 Compatible MFDs and instructions ==== ==== 6.2 Compatible MFDs and instructions ====
  
-  * [[https://docs.victronenergy.com/gx/mfd-garmin.html|Instructions for Garmin MFDs]]+  * [[https://www.victronenergy.com/live/venus-os:mfd-garmin|Instructions for Garmin MFDs]]
   * [[venus-os:mfd-navico|Instructions for Navico MFDs]] (Simrad, B&D, Lowrance)   * [[venus-os:mfd-navico|Instructions for Navico MFDs]] (Simrad, B&D, Lowrance)
   * [[venus-os:mfd-raymarine|Instructions for Raymarine]] - Note support on Raymarine MFDs is pending a Raymarine firmware update. [[https://www.victronenergy.com/blog/|Subscribe to our blog (link at the bottom)]], or for direct customers, monitor our weekly e-mail, to be informed about that release.   * [[venus-os:mfd-raymarine|Instructions for Raymarine]] - Note support on Raymarine MFDs is pending a Raymarine firmware update. [[https://www.victronenergy.com/blog/|Subscribe to our blog (link at the bottom)]], or for direct customers, monitor our weekly e-mail, to be informed about that release.
Line 938: Line 940:
  
 Furuno: support on Furuno MFDs is in the pipeline. There is no expected date of availability. Furuno: support on Furuno MFDs is in the pipeline. There is no expected date of availability.
- 
 ===== 7 More information resources ===== ===== 7 More information resources =====
   * [[:ccgx:generator_start_stop|CCGX Genset start/stop]]   * [[:ccgx:generator_start_stop|CCGX Genset start/stop]]