ccgx:start [2019-10-10 16:35] guy_stewartccgx:start [2019-10-18 10:41] – [6.1 Introduction & requirements] mvader
Line 569: Line 569:
 The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode. The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode.
  
-The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''.+The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''. Or reprogram the Multis and modify the phase assigned to match the wiring
  
 On the GX device itself, the warning will be popup as a notification on the GUI: On the GX device itself, the warning will be popup as a notification on the GUI:
Line 912: Line 912:
   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.
   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.
-  * Monitor solar production from an MPPT.+  * Monitor solar production from an MPPT Solar Charger.
   * Monitor AC loads, and DC loads.   * Monitor AC loads, and DC loads.
   * Control shore power input current limit.   * Control shore power input current limit.
Line 918: Line 918:
   * Optionally open the Victron Remote Console panel; allowing access to further parameters.   * Optionally open the Victron Remote Console panel; allowing access to further parameters.
  
-Power equipment compatibility:+Victron equipment compatibility:
   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.
   * Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS.   * Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS.
   * All Victron MPPT Solar Charge Controllers   * All Victron MPPT Solar Charge Controllers
  
-Requirements:+Required components:
   * Battery system.   * Battery system.
   * Victron inverter/charger.   * Victron inverter/charger.