User Tools

Site Tools


ccgx:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
ccgx:start [2019-10-03 13:32] – [5.4 Trouble shooting data logging] mvaderccgx:start [2019-10-18 10:41] – [6.1 Introduction & requirements] mvader
Line 335: Line 335:
 |Enable password check | Choose password to allow remote console access.|| |Enable password check | Choose password to allow remote console access.||
 |Enable on VRM |No|Enabling on VRM will allow connection to the CCGX from anywhere via the VRM portal. [[vrm_portal:troubleshooting_ccgx_vrm_connectivity#trouble_shooting_remote_console_on_vrm|Trouble shooting Remote Console on VRM]]| |Enable on VRM |No|Enabling on VRM will allow connection to the CCGX from anywhere via the VRM portal. [[vrm_portal:troubleshooting_ccgx_vrm_connectivity#trouble_shooting_remote_console_on_vrm|Trouble shooting Remote Console on VRM]]|
-|Enable on LAN |No|Enabling will allow direct connection to the CCGX by typing it'IP address into a web browser. Only Enable this function on trusted networks. Disable password check, or set password first|+|Enable on LAN |No|Enabling will allow direct connection to the CCGX by typing its IP address or Venus.local into a web browser, or in VictronConnect when connected to the same network. Only Enable this function on trusted networks. Disable password check, or set password first|
 |**System setup** ||| |**System setup** |||
 |AC input 1 |Generator |Select Generator or Grid. (We will shortly be adding the setting 'Shore power' instead of grid.) | |AC input 1 |Generator |Select Generator or Grid. (We will shortly be adding the setting 'Shore power' instead of grid.) |
Line 569: Line 569:
 The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode. The AC supply, either Generator or Grid, to a three phase inverter/charger system needs to be in the correct rotation, also known as sequence. If not, then the Inverter/chargers will not accept the AC supply and remain in Inverter mode.
  
-The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''.+The ''Phase rotation warning'' will be raised in such case. To resolve the issue, change the wiring on the AC input: swap either one of the phases, effectively changing the rotation from ''L3 -> L2 -> L1'' to ''L1 -> L2 -> L3''. Or reprogram the Multis and modify the phase assigned to match the wiring
  
 On the GX device itself, the warning will be popup as a notification on the GUI: On the GX device itself, the warning will be popup as a notification on the GUI:
Line 904: Line 904:
  
 https://www.youtube.com/watch?v=RWdEQfYZKEs https://www.youtube.com/watch?v=RWdEQfYZKEs
 +
 +[[https://www.youtube.com/watch?v=RWdEQfYZKEs|{{:ccgx:glass_bridge_example.jpg?direct&400|}}]]
  
 Functionalities: Functionalities:
Line 910: Line 912:
   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.   * Monitor battery status for one or more batteries. By using the voltage of for example battery chargers, it can also visualise secondary batteries such as Generator starter batteries.
   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.   * Monitor the power conversion equipment: chargers, inverters, inverter/chargers.
 +  * Monitor solar production from an MPPT Solar Charger.
   * Monitor AC loads, and DC loads.   * Monitor AC loads, and DC loads.
   * Control shore power input current limit.   * Control shore power input current limit.
Line 915: Line 918:
   * Optionally open the Victron Remote Console panel; allowing access to further parameters.   * Optionally open the Victron Remote Console panel; allowing access to further parameters.
  
-Power equipment compatibility:+Victron equipment compatibility:
   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.   * All Victron inverter/chargers: From a 500VA single phase device up to a large 180kVA three phase-system, including Multis, Quattros, 230VAC and 120VAC models.
-Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS.+  * Battery Monitors: BMV-700, BMV-702, BMV-712 and newer, Lynx Shunt VE.Can, Lynx Ion BMS. 
 +  * All Victron MPPT Solar Charge Controllers
  
-Requirements:+Required components:
   * Battery system.   * Battery system.
   * Victron inverter/charger.   * Victron inverter/charger.
Line 930: Line 934:
   * [[https://docs.victronenergy.com/gx/mfd-garmin.html|Instructions for Garmin MFDs]]   * [[https://docs.victronenergy.com/gx/mfd-garmin.html|Instructions for Garmin MFDs]]
   * [[venus-os:mfd-navico|Instructions for Navico MFDs]] (Simrad, B&D, Lowrance)   * [[venus-os:mfd-navico|Instructions for Navico MFDs]] (Simrad, B&D, Lowrance)
 +  * [[venus-os:mfd-raymarine|Instructions for Raymarine]] - Note support on Raymarine MFDs is pending a Raymarine firmware update. [[https://www.victronenergy.com/blog/|Subscribe to our blog (link at the bottom)]], or for direct customers, monitor our weekly e-mail, to be informed about that release.
  
-Raymarine: support on Raymarine MFDs is pending a Raymarine firmware update. [[https://www.victronenergy.com/blog/|Subscribe to our blog (link at the bottom)]], or for direct customers, monitor our weekly e-mail, to be informed about that release. 
  
 Furuno: support on Furuno MFDs is in the pipeline. There is no expected date of availability. Furuno: support on Furuno MFDs is in the pipeline. There is no expected date of availability.
Line 951: Line 955:
 ===== DISQUS ===== ===== DISQUS =====
 ~~DISQUS~~ ~~DISQUS~~
- 
ccgx/start.txt · Last modified: 2023-01-19 15:08 by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki