User Tools

Site Tools


ccgx:ccgx_faq

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
ccgx:ccgx_faq [2019-06-15 03:55] guy_stewartccgx:ccgx_faq [2019-08-14 04:08] – [Q20: Issues with Multi not starting when CCGX is connected / Caution when powering the CCGX from the AC-out terminal of a VE.Bus Inverter, Multi or Quattro] simonhackett
Line 169: Line 169:
    
 Cutting/Removing pin 7 of the VE.Bus cable to the CCGX (brown/white according to standard RJ45 ethernet cable colour coding) allows the VE.Bus products to start up without waiting for the CCGX to boot up first. Cutting/Removing pin 7 of the VE.Bus cable to the CCGX (brown/white according to standard RJ45 ethernet cable colour coding) allows the VE.Bus products to start up without waiting for the CCGX to boot up first.
 +
 +Note that when using a Redflow ZBM2/ZCell battery, pin 7 should be cut even if the CCGX is DC powered, to avoid the same deadlock at times when the Redflow battery cluster is at 0% SoC.
  
 {{:ccgx:ccgx_pin7.jpg?direct&400|}} {{:ccgx:ccgx_pin7.jpg?direct&400|}}
ccgx/ccgx_faq.txt · Last modified: 2021-02-05 11:34 by marmour

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki