User Tools

Site Tools


ccgx:ccgx_faq

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
ccgx:ccgx_faq [2019-06-15 03:55]
guy_stewart
ccgx:ccgx_faq [2019-08-14 04:08]
simonhackett [Q20: Issues with Multi not starting when CCGX is connected / Caution when powering the CCGX from the AC-out terminal of a VE.Bus Inverter, Multi or Quattro]
Line 169: Line 169:
    
 Cutting/​Removing pin 7 of the VE.Bus cable to the CCGX (brown/​white according to standard RJ45 ethernet cable colour coding) allows the VE.Bus products to start up without waiting for the CCGX to boot up first. Cutting/​Removing pin 7 of the VE.Bus cable to the CCGX (brown/​white according to standard RJ45 ethernet cable colour coding) allows the VE.Bus products to start up without waiting for the CCGX to boot up first.
 +
 +Note that when using a Redflow ZBM2/ZCell battery, pin 7 should be cut even if the CCGX is DC powered, to avoid the same deadlock at times when the Redflow battery cluster is at 0% SoC.
  
 {{:​ccgx:​ccgx_pin7.jpg?​direct&​400|}} {{:​ccgx:​ccgx_pin7.jpg?​direct&​400|}}
ccgx/ccgx_faq.txt · Last modified: 2019-08-15 12:34 by guy_stewart