ac_coupling:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
ac_coupling:start [2020-06-18 16:13] – [2.4 Should you look at the total PV array, or the PV inverter rating?] marmour | ac_coupling:start [2020-09-03 10:56] – removed accubank? guy_stewart | ||
---|---|---|---|
Line 72: | Line 72: | ||
==== 3.1 Lead batteries ==== | ==== 3.1 Lead batteries ==== | ||
1 kWp installed PV power requires approximately 5kWh of battery: | 1 kWp installed PV power requires approximately 5kWh of battery: | ||
- | * 100 Ah accubank | + | * 100 Ah at 48 Vdc |
- | * 200 Ah accubank | + | * 200 Ah at 24 Vdc |
- | * 400 Ah accubank | + | * 400 Ah at 12 Vdc |
==== 3.2 Lithium batteries ==== | ==== 3.2 Lithium batteries ==== | ||
1,5 kWp installed PV power requires: | 1,5 kWp installed PV power requires: | ||
- | * 100 Ah accubank | + | * 100 Ah at 48 Vdc |
- | * 200 Ah accubank | + | * 200 Ah at 24 Vdc |
- | * 400 Ah accubank | + | * 400 Ah at 12 Vdc |
===== 4 Requirement of adding DC-Coupling - MPPT Solar Chargers ===== | ===== 4 Requirement of adding DC-Coupling - MPPT Solar Chargers ===== |