{"id":20909,"date":"2020-08-25T09:01:06","date_gmt":"2020-08-25T07:01:06","guid":{"rendered":"https:\/\/www.victronenergy.com\/blog\/?p=20909"},"modified":"2020-08-25T09:01:06","modified_gmt":"2020-08-25T07:01:06","slug":"hybrid-electric-vessel-powering-across-zurich-lake","status":"publish","type":"post","link":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/","title":{"rendered":"Hybrid Electric vessel &#8211; powering across Z\u00fcrich Lake"},"content":{"rendered":"<p>Swiss Passenger vessels <em>Forch<\/em> and <em>Zimmermann<\/em>\u00a0have just had re-fits to their power drive systems &#8211; dramatically reducing running costs, and simplifying their engine rooms, too.<\/p>\n<p>Previously, the only way to meet the vessels&#8217; peak power demand was to install a pair of 27kVA generators &#8211; even though their energy consumption averaged just 8kVA.\u00a0Now the ships&#8217; power demands are met without using any generators at all!<a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-20944\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-1024x768.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-1024x768.jpeg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-1500x1125.jpeg 1500w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-750x563.jpeg 750w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-1536x1152.jpeg 1536w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-768x576.jpeg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898-300x225.jpeg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.48-1_141009898.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>In preparation for the re-fits various energy-saving measures were examined &#8211; electric motor, hybrid drive etc.; before deciding on hybrid power generation system. The new arrangement not only saves fuel by generating electricity on demand, but it also means more space and less maintenance in the engine room. Efficiency of the ship is improved; and maintenance costs are reduced: having done away with two extra motors, the expensive particle filters could also be removed &#8230;and problems with the alternators and short-circuit power from the old inverters are now history.<a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-20960\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-1024x768.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-1024x768.jpeg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-1500x1125.jpeg 1500w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-750x563.jpeg 750w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-1536x1152.jpeg 1536w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-768x576.jpeg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340-300x225.jpeg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.46-2_141067340.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.zsg.ch\/en\/\" target=\"_blank\">Z\u00fcrichsee Schifffahrtsgesellschaft<\/a>\u00a0ZSG operate a fleet of 17 vessels, including two paddle-steamers, which take tourists on gastronomic, nostalgic, or sightseeing tours of the Alpine lake.<\/p>\n<p>The design and installation of the new power-plants was the responsibility of <a href=\"https:\/\/translate.google.com\/translate?hl=en&amp;sl=de&amp;u=https:\/\/www.leab.ch\/&amp;prev=search&amp;pto=aue\" target=\"_blank\">LEAB<\/a>\u00a0who specialise in mobile energy applications.<\/p>\n<p>The installation of DC systems with high currents over long distances needed careful consideration &#8211;\u00a0<em>Roland Reutimann<\/em>, Executive Director of the Swiss remote energy specialist &#8211;\u00a0chose to install a 24V lithium system with 6x 12V 160Ah Super-B batteries, which feed 2 sets of 3 Victron <a href=\"https:\/\/www.victronenergy.com\/inverters-chargers\/quattro\" target=\"_blank\">Quattro<\/a>\u00a0Inverter\/Chargers &#8211; each configured for three-phase supply. The models chosen were 24V 8kVA. Both vessels have been equipped with identical systems.<a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-20945\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-1024x768.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-1024x768.jpeg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-1500x1125.jpeg 1500w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-750x563.jpeg 750w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-1536x1152.jpeg 1536w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-768x576.jpeg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910-300x225.jpeg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.49_141009910.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>Reutimann says: <em>We were able to create a redundant system using an automatic transfer switch &#8211; so if one Quattro 400VAC row fails, the second 400VAC automatically takes over\u00a0the entire operation. The batteries are charged via the alternators of the boat engines, which together produce 400ADC. The continuous consumption of the entire boat\u00a0is around 300A at 24V. This means that the batteries are always full and, should the boat engines fail, we can guarantee continued operation for more than 1 hour<\/em><em>.<a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/LEAB_RRE_141010042_141236335.jpg\" target=\"_blank\"><div class=\"full-size-image container\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-20965 aligncenter\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/LEAB_RRE_141010042_141236335.jpg\" alt=\"\" width=\"365\" height=\"445\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/LEAB_RRE_141010042_141236335.jpg 365w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/LEAB_RRE_141010042_141236335-246x300.jpg 246w\" sizes=\"auto, (max-width: 365px) 100vw, 365px\" \/><\/div><\/a><\/em><\/p>\n<p>Lake Z\u00fcrich is twenty-five miles long and two wide &#8211; so an hour of operating time is ample to return to the safety of the shore.<\/p>\n<p>Established for over 30 years, LEAB AG supply and install solar panels, batteries, inverters, chargers, generators, etc., for industries such as manufacturing &#8211; in Emergency vehicles, Utility vehicles, Caravans; and also in remote Alpine Houses. The company\u00a0have their own workshop where the devices can be pre-installed; and their long experience has taught them what kinds of hurdles the customer might have.<a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349.jpeg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-20961\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-1024x768.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-1024x768.jpeg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-1500x1125.jpeg 1500w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-750x563.jpeg 750w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-1536x1152.jpeg 1536w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-768x576.jpeg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349-300x225.jpeg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/WhatsApp-Image-2020-08-11-at-16.32.47-2_141067349.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>Their solution has certainly proved popular with ship owner ZSG, who are very pleased with the new arrangement, describing it as <em>&#8230;an easy-to-use system that saves space and fuel &#8211; for us the right step into the future.\u00a0<\/em><\/p>\n<p>We can see LEAB&#8217;s installation in this short clip:<\/p>\n\n<!-- iframe plugin v.6.0 wordpress.org\/plugins\/iframe\/ -->\n<iframe loading=\"lazy\" 0=\"src=&quot;&lt;iframe\" width=\"100%\" height=\"400\" src=\"https:\/\/www.youtube.com\/embed\/CBL3YEfohks\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" 1=\"allowfullscreen&gt;&lt;\/iframe&gt;&quot;\" allowfullscreen=\"allowfullscreen\" scrolling=\"yes\" class=\"iframe-class\"><\/iframe>\n\n<p>The headline image is owned by\u00a0<a href=\"https:\/\/commons.wikimedia.org\/wiki\/User:Beata_May\" target=\"_blank\">Eluveitie<\/a>\u00a0and is reproduced, unaltered, with kind permission.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swiss Passenger vessels Forch and Zimmermann\u00a0have just had re-fits to their power drive systems &#8211; dramatically reducing running costs, and simplifying their engine rooms, too. Previously, the only way to meet the vessels&#8217; peak power demand was to install a pair of 27kVA generators &#8211; even though their energy consumption averaged just 8kVA.\u00a0Now the ships&#8217; [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":21021,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[128],"tags":[],"class_list":["post-20909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-users-stories"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy\" \/>\n<meta property=\"og:description\" content=\"Swiss Passenger vessels Forch and Zimmermann\u00a0have just had re-fits to their power drive systems &#8211; dramatically reducing running costs, and simplifying their engine rooms, too. Previously, the only way to meet the vessels&#8217; peak power demand was to install a pair of 27kVA generators &#8211; even though their energy consumption averaged just 8kVA.\u00a0Now the ships&#8217; [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/\" \/>\n<meta property=\"og:site_name\" content=\"Victron Energy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VictronEnergy.BV\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-25T07:01:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1588\" \/>\n\t<meta property=\"og:image:height\" content=\"632\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"justin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Victron_Energy\" \/>\n<meta name=\"twitter:site\" content=\"@Victron_Energy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"justin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/\"},\"author\":{\"name\":\"justin\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/person\\\/ad9b873a3dd66b91438394aecb8767bd\"},\"headline\":\"Hybrid Electric vessel &#8211; powering across Z\u00fcrich Lake\",\"datePublished\":\"2020-08-25T07:01:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/\"},\"wordCount\":540,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/08\\\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg\",\"articleSection\":[\"Users stories\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/\",\"name\":\"Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/08\\\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg\",\"datePublished\":\"2020-08-25T07:01:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/08\\\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg\",\"contentUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/08\\\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg\",\"width\":1588,\"height\":632},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2020\\\/08\\\/25\\\/hybrid-electric-vessel-powering-across-zurich-lake\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hybrid Electric vessel &#8211; powering across Z\u00fcrich Lake\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\",\"name\":\"Victron Energy\",\"description\":\"Blue power\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\",\"name\":\"Victron Energy\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/02\\\/victron-energy-logo_125887203.png\",\"contentUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/02\\\/victron-energy-logo_125887203.png\",\"width\":404,\"height\":125,\"caption\":\"Victron Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/VictronEnergy.BV\",\"https:\\\/\\\/x.com\\\/Victron_Energy\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/victron-energy\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/VictronEnergyBV\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/person\\\/ad9b873a3dd66b91438394aecb8767bd\",\"name\":\"justin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g\",\"caption\":\"justin\"},\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/author\\\/justin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/","og_locale":"en_US","og_type":"article","og_title":"Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy","og_description":"Swiss Passenger vessels Forch and Zimmermann\u00a0have just had re-fits to their power drive systems &#8211; dramatically reducing running costs, and simplifying their engine rooms, too. Previously, the only way to meet the vessels&#8217; peak power demand was to install a pair of 27kVA generators &#8211; even though their energy consumption averaged just 8kVA.\u00a0Now the ships&#8217; [&hellip;]","og_url":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/","og_site_name":"Victron Energy","article_publisher":"https:\/\/www.facebook.com\/VictronEnergy.BV","article_published_time":"2020-08-25T07:01:06+00:00","og_image":[{"width":1588,"height":632,"url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg","type":"image\/jpeg"}],"author":"justin","twitter_card":"summary_large_image","twitter_creator":"@Victron_Energy","twitter_site":"@Victron_Energy","twitter_misc":{"Written by":"justin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#article","isPartOf":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/"},"author":{"name":"justin","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/person\/ad9b873a3dd66b91438394aecb8767bd"},"headline":"Hybrid Electric vessel &#8211; powering across Z\u00fcrich Lake","datePublished":"2020-08-25T07:01:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/"},"wordCount":540,"commentCount":0,"publisher":{"@id":"https:\/\/www.victronenergy.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#primaryimage"},"thumbnailUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg","articleSection":["Users stories"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/","url":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/","name":"Hybrid Electric vessel - powering across Z\u00fcrich Lake - Victron Energy","isPartOf":{"@id":"https:\/\/www.victronenergy.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#primaryimage"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#primaryimage"},"thumbnailUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg","datePublished":"2020-08-25T07:01:06+00:00","breadcrumb":{"@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#primaryimage","url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg","contentUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/08\/Panoramic_of_Lake_Zurich_Switzerland_142104932.jpg","width":1588,"height":632},{"@type":"BreadcrumbList","@id":"https:\/\/www.victronenergy.com\/blog\/2020\/08\/25\/hybrid-electric-vessel-powering-across-zurich-lake\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.victronenergy.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Hybrid Electric vessel &#8211; powering across Z\u00fcrich Lake"}]},{"@type":"WebSite","@id":"https:\/\/www.victronenergy.com\/blog\/#website","url":"https:\/\/www.victronenergy.com\/blog\/","name":"Victron Energy","description":"Blue power","publisher":{"@id":"https:\/\/www.victronenergy.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.victronenergy.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.victronenergy.com\/blog\/#organization","name":"Victron Energy","url":"https:\/\/www.victronenergy.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/02\/victron-energy-logo_125887203.png","contentUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/02\/victron-energy-logo_125887203.png","width":404,"height":125,"caption":"Victron Energy"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VictronEnergy.BV","https:\/\/x.com\/Victron_Energy","https:\/\/www.linkedin.com\/company\/victron-energy\/","https:\/\/www.youtube.com\/user\/VictronEnergyBV"]},{"@type":"Person","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/person\/ad9b873a3dd66b91438394aecb8767bd","name":"justin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g","caption":"justin"},"url":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/"}]}},"popularity_stats":{"1_day_stats":1,"7_day_stats":4,"30_day_stats":28,"all_time_stats":1783},"author_name":"justin","title_plain_text":"Hybrid Electric vessel \u2013 powering across Z\u00fcrich Lake","excerpt_plain_text":"Swiss Passenger vessels Forch and Zimmermann\u00a0have just had re-fits to their power drive systems \u2013 dramatically reducing running costs, and simplifying their engine rooms, too. Previously, the only way to meet the vessels\u2019 peak power demand was to install a pair of 27kVA generators \u2013 even though their energy consumption averaged just 8kVA.\u00a0Now the ships\u2019 [\u2026]","subtitle":"Three Phase Inverters replace old generators","related_posts":[{"id":33440,"slug":"community-generates-four-times-the-energy-it-consumes","title":"Community generates four times the energy it consumes","link":"https:\/\/www.victronenergy.com\/blog\/2026\/06\/10\/community-generates-four-times-the-energy-it-consumes\/","excerpt":"Viewed from the village square, Alte Schmitte appears to be an ordinary residential neighbourhood. PV modules are integrated into roofs and fa\u00e7ades rather than added as separate elements, allowing the buildings to exhibit a cohesive architectural appearance. Behind that appearance, however, is an energy system that enables twenty-seven households to live in a community which&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/06\/DJI_0955_324776455-150x150.jpg","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-06-10T08:32:13+02:00","date_gmt":"2026-06-10T06:32:13+00:00"},{"id":33386,"slug":"irrigating-two-million-acres","title":"Irrigating Two-million Acres","link":"https:\/\/www.victronenergy.com\/blog\/2026\/05\/29\/irrigating-two-million-acres\/","excerpt":"Madura Plains is a remote sheep station on Nullarbor, an arid, treeless limestone plain of 200,0000km\u00b2 in south Australia. Its viability depends on bore holes, tanked-reservoirs, and a pumping system through 1400km of water pipelines to over 200 drinking troughs. Until recently water provision across the property relied on a variety of pumping arrangements which&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/05\/Screenshot-2026-05-29-at-09.06.07_323887739-150x150.png","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-05-29T17:19:32+02:00","date_gmt":"2026-05-29T15:19:32+00:00"},{"id":33326,"slug":"energy-security-guarantees-towns-water-supply","title":"Energy security guarantees town&#8217;s water supply","link":"https:\/\/www.victronenergy.com\/blog\/2026\/05\/20\/energy-security-guarantees-towns-water-supply\/","excerpt":"A remote reservoir which provides drinking water to over 35,000 customers is entirely monitored and controlled by an off-grid power installation which must not fail. Electricity energises their control systems, operates the water treatment plant, and opens and closes pump valves. The lead acid batteries which had provided back up power were coming to the&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/05\/McMinnville_Water_and_Light-McGuire_Dam-Drone_Shots-Artek-260409-021_321822343-150x150.jpg","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-05-20T08:40:29+02:00","date_gmt":"2026-05-20T06:40:29+00:00"}],"_links":{"self":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/20909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/comments?post=20909"}],"version-history":[{"count":19,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/20909\/revisions"}],"predecessor-version":[{"id":21023,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/20909\/revisions\/21023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/media\/21021"}],"wp:attachment":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/media?parent=20909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/categories?post=20909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/tags?post=20909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}