{"id":11133,"date":"2017-10-30T11:56:41","date_gmt":"2017-10-30T09:56:41","guid":{"rendered":"https:\/\/www.victronenergy.com\/blog\/?p=11133"},"modified":"2024-09-02T15:44:46","modified_gmt":"2024-09-02T13:44:46","slug":"reserva-nacional-do-gile-when-off-grid-meets-off-road","status":"publish","type":"post","link":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/","title":{"rendered":"Reserva Nacional do Gil\u00e9 &#8211; when off-grid meets off-road"},"content":{"rendered":"<p>The Dakar Rally off-road race is quite something, yet it seems building an off-grid system in remote parts of Africa is equally daunting &#8211; 8 tons of equipment needed to be transported to the\u00a0<a href=\"https:\/\/pt.wikipedia.org\/wiki\/Reserva_do_Gil%C3%A9\" target=\"_blank\">Reserva Nacional do Gil\u00e9<\/a>, over &#8216;roads&#8217; like those shown above.<\/p>\n<p>The reserve is located in the province of Zamb\u00e9zia, in <a href=\"https:\/\/en.wikipedia.org\/wiki\/Mozambique\" target=\"_blank\">Mozambique<\/a>. With national protection status this gem of an area protects various species of fauna, along with rhinoceros and elephant, not to mention, pangolins, striped jackals, spotted hyenas, lions, leopards, wild cats, reptiles and various species of birds.<\/p>\n<p>To continue to manage and protect the reserve its headquarters needed to be refurbished &#8211; and that meant a new off-grid power plant for 22 buildings.<\/p>\n<p><em>Who you gonna call?<\/em><!--more--><\/p>\n<h3>Grid Busters<\/h3>\n<p>It was Victron Energy specialist SMART Energysystems International based in Karlsruhe, Germany that got the call from their partner SwissSolar Lda in Maputo, Mozambique &#8211; and as Martin Hauck of SMART Energysystems told me:<\/p>\n<p>&#8220;We knew the challenge was multifaceted, not least the logistics of getting 8 tons of equipment to site, then there was the installation itself &#8211; in the middle of nowhere &#8211; plus the fact that the client asked for local involvement. All this combined didn&#8217;t make our task any easier!<\/p>\n<p>In order to have no surprises on site, our partner decided to get the equipment to Mozambique&#8217;s capital <a href=\"https:\/\/en.wikipedia.org\/wiki\/Maputo\" target=\"_blank\">Maputo<\/a> first and make a virtual installation of the entire project, together with his team, before transporting it all to the reserve. Once the virtual install was done it then took the lorry four days to reach <a href=\"https:\/\/en.wikipedia.org\/wiki\/Mocuba\" target=\"_blank\">Mocuba<\/a>, the last town before entering the reserve. From there it was a 15 hour,\u00a0270km off-road drive to reach the installation site.&#8221;<\/p>\n<h3>Installation<\/h3>\n<p>A local civil engineering company was commissioned to construct the equipment building and solar array support.<\/p>\n<p><a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-blogpost-content wp-image-11148\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-690x518.jpg\" alt=\"\" width=\"690\" height=\"518\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-690x518.jpg 690w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-730x548.jpg 730w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-1024x768.jpg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-768x576.jpg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543-300x225.jpg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Equipment-building_53040543.jpg 1920w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><\/a><\/p>\n<p>The building was sited beneath the solid wooden support structure, with the solar array mounted on top of that.<\/p>\n<p><a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-blogpost-content wp-image-11149\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-690x333.jpg\" alt=\"\" width=\"690\" height=\"333\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-690x333.jpg 690w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-730x352.jpg 730w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-1024x494.jpg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-768x371.jpg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590-300x145.jpg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Solar-array_53040590.jpg 1920w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><\/a><\/p>\n<p>The installation and commissioning of the off-grid power system was done by Mr. Ziegler from SwissSolar Lda. The solar system was installed quickly within a few days, with power to the 22 buildings via 1,100m of cabling being completed over the next few weeks.<\/p>\n<h3>System design<\/h3>\n<p>The solar array is 12.6 kWp and feeds a VRLA battery storage bank from Hoppecke, which has 60kWh of total energy storage.<\/p>\n<p><a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-blogpost-content wp-image-11151\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-690x518.jpg\" alt=\"\" width=\"690\" height=\"518\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-690x518.jpg 690w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-730x548.jpg 730w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-1024x768.jpg 1024w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-768x576.jpg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294-300x225.jpg 300w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Power-room_53041294.jpg 1920w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><\/a><\/p>\n<p>The power system is designed for 3-phase, which includes a pre-wired plug&#8217;n&#8217;play control cabinet utilising:<\/p>\n<ul>\n<li>3 x <a href=\"https:\/\/www.victronenergy.com\/inverters-chargers\/quattro\" target=\"_blank\">Quattro<\/a> 8000 inverters<\/li>\n<li>3 x <a href=\"https:\/\/www.victronenergy.com\/solar-charge-controllers\/smartsolar-250-85-250-100\" target=\"_blank\">BlueSolar MPPT 150\/85 charge controllers<\/a><\/li>\n<li>1 x <a href=\"https:\/\/www.victronenergy.com\/panel-systems-remote-monitoring\/bmv-700\" target=\"_blank\">BMV<\/a> with 2,000A Shunt<\/li>\n<li>1 x <a href=\"https:\/\/www.victronenergy.com\/panel-systems-remote-monitoring\/color-control\" target=\"_blank\">Color Control GX<\/a><\/li>\n<\/ul>\n<p><a href=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-blogpost-content wp-image-11152\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-690x793.jpg\" alt=\"\" width=\"690\" height=\"793\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-690x793.jpg 690w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-730x839.jpg 730w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-891x1024.jpg 891w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-768x883.jpg 768w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318-261x300.jpg 261w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/3-Phase-Quattros_53041318.jpg 1920w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><\/a><\/p>\n<h3>Conclusion<\/h3>\n<p>It never fails to amaze me with the remote locations and challenges that go into installing Victron Energy systems. This project was clearly no exception and they didn&#8217;t even have mobile phone use on site, so it&#8217;s testament to the companies involved that their prior planning paid off &#8211; in what is clearly a successful project.<\/p>\n<p>Mobile phone use or not, apparently the Welotec GPRS router is managing to connect to the VRM portal. You can check it out here:<br \/>\n<a href=\"https:\/\/vrm.victronenergy.com\/installation\/12959\/share\/b3b43237\" target=\"_blank\">https:\/\/vrm.victronenergy.com\/installation\/12959\/share\/b3b43237<\/a><\/p>\n<p>John Rushworth<\/p>\n<h5>Credits<\/h5>\n<p>Thanks to <a href=\"https:\/\/www.victronenergy.com\/blog\/2015\/09\/14\/victron-energy-people-who-is-bob-hopman\/\" target=\"_blank\">Bob Hopman<\/a> of Victron Energy for making me aware of this project and to Martin Hauck (T<span lang=\"EN-GB\">echnical Director <\/span>of SMART Energysystems International\u00a0<span lang=\"EN-GB\">AG<\/span>) for the information and images used in this blog.<\/p>\n<h5>Links<\/h5>\n<p><a href=\"http:\/\/www.smart-energy.ag\/en\/\" target=\"_blank\"><div class=\"full-size-image container\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-11169 size-full\" src=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/logo_2016_md_without_weblink_53202624.png\" alt=\"\" width=\"400\" height=\"104\" srcset=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/logo_2016_md_without_weblink_53202624.png 400w, https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/logo_2016_md_without_weblink_53202624-300x78.png 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/div><\/a><\/p>\n<p><a href=\"http:\/\/www.smart-energy.ag\/en\/\" target=\"_blank\">SMART Energysystems International<\/a><\/p>\n<p>SwissSolar Lda(Project partner)<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Dakar Rally off-road race is quite something, yet it seems building an off-grid system in remote parts of Africa is equally daunting &#8211; 8 tons of equipment needed to be transported to the\u00a0Reserva Nacional do Gil\u00e9, over &#8216;roads&#8217; like those shown above. The reserve is located in the province of Zamb\u00e9zia, in Mozambique. With [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":11136,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[128],"tags":[],"class_list":["post-11133","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-users-stories"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy\" \/>\n<meta property=\"og:description\" content=\"The Dakar Rally off-road race is quite something, yet it seems building an off-grid system in remote parts of Africa is equally daunting &#8211; 8 tons of equipment needed to be transported to the\u00a0Reserva Nacional do Gil\u00e9, over &#8216;roads&#8217; like those shown above. The reserve is located in the province of Zamb\u00e9zia, in Mozambique. With [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/\" \/>\n<meta property=\"og:site_name\" content=\"Victron Energy\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VictronEnergy.BV\" \/>\n<meta property=\"article:published_time\" content=\"2017-10-30T09:56:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-02T13:44:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"730\" \/>\n\t<meta property=\"og:image:height\" content=\"548\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Rushworth\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Victron_Energy\" \/>\n<meta name=\"twitter:site\" content=\"@Victron_Energy\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Rushworth\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/\"},\"author\":{\"name\":\"John Rushworth\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/person\\\/1fc7df7ea591797404c8c720eff2736e\"},\"headline\":\"Reserva Nacional do Gil\u00e9 &#8211; when off-grid meets off-road\",\"datePublished\":\"2017-10-30T09:56:41+00:00\",\"dateModified\":\"2024-09-02T13:44:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/\"},\"wordCount\":567,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2017\\\/10\\\/Offroad_53026183.jpg\",\"articleSection\":[\"Users stories\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/\",\"name\":\"Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2017\\\/10\\\/Offroad_53026183.jpg\",\"datePublished\":\"2017-10-30T09:56:41+00:00\",\"dateModified\":\"2024-09-02T13:44:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2017\\\/10\\\/Offroad_53026183.jpg\",\"contentUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2017\\\/10\\\/Offroad_53026183.jpg\",\"width\":730,\"height\":548},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/2017\\\/10\\\/30\\\/reserva-nacional-do-gile-when-off-grid-meets-off-road\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reserva Nacional do Gil\u00e9 &#8211; when off-grid meets off-road\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\",\"name\":\"Victron Energy\",\"description\":\"Blue power\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#organization\",\"name\":\"Victron Energy\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/02\\\/victron-energy-logo_125887203.png\",\"contentUrl\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2020\\\/02\\\/victron-energy-logo_125887203.png\",\"width\":404,\"height\":125,\"caption\":\"Victron Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/VictronEnergy.BV\",\"https:\\\/\\\/x.com\\\/Victron_Energy\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/victron-energy\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/VictronEnergyBV\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/#\\\/schema\\\/person\\\/1fc7df7ea591797404c8c720eff2736e\",\"name\":\"John Rushworth\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g\",\"caption\":\"John Rushworth\"},\"url\":\"https:\\\/\\\/www.victronenergy.com\\\/blog\\\/author\\\/john-rushworth\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/","og_locale":"en_US","og_type":"article","og_title":"Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy","og_description":"The Dakar Rally off-road race is quite something, yet it seems building an off-grid system in remote parts of Africa is equally daunting &#8211; 8 tons of equipment needed to be transported to the\u00a0Reserva Nacional do Gil\u00e9, over &#8216;roads&#8217; like those shown above. The reserve is located in the province of Zamb\u00e9zia, in Mozambique. With [&hellip;]","og_url":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/","og_site_name":"Victron Energy","article_publisher":"https:\/\/www.facebook.com\/VictronEnergy.BV","article_published_time":"2017-10-30T09:56:41+00:00","article_modified_time":"2024-09-02T13:44:46+00:00","og_image":[{"width":730,"height":548,"url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg","type":"image\/jpeg"}],"author":"John Rushworth","twitter_card":"summary_large_image","twitter_creator":"@Victron_Energy","twitter_site":"@Victron_Energy","twitter_misc":{"Written by":"John Rushworth","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#article","isPartOf":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/"},"author":{"name":"John Rushworth","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/person\/1fc7df7ea591797404c8c720eff2736e"},"headline":"Reserva Nacional do Gil\u00e9 &#8211; when off-grid meets off-road","datePublished":"2017-10-30T09:56:41+00:00","dateModified":"2024-09-02T13:44:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/"},"wordCount":567,"commentCount":0,"publisher":{"@id":"https:\/\/www.victronenergy.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#primaryimage"},"thumbnailUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg","articleSection":["Users stories"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/","url":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/","name":"Reserva Nacional do Gil\u00e9 - when off-grid meets off-road - Victron Energy","isPartOf":{"@id":"https:\/\/www.victronenergy.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#primaryimage"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#primaryimage"},"thumbnailUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg","datePublished":"2017-10-30T09:56:41+00:00","dateModified":"2024-09-02T13:44:46+00:00","breadcrumb":{"@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#primaryimage","url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg","contentUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2017\/10\/Offroad_53026183.jpg","width":730,"height":548},{"@type":"BreadcrumbList","@id":"https:\/\/www.victronenergy.com\/blog\/2017\/10\/30\/reserva-nacional-do-gile-when-off-grid-meets-off-road\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.victronenergy.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Reserva Nacional do Gil\u00e9 &#8211; when off-grid meets off-road"}]},{"@type":"WebSite","@id":"https:\/\/www.victronenergy.com\/blog\/#website","url":"https:\/\/www.victronenergy.com\/blog\/","name":"Victron Energy","description":"Blue power","publisher":{"@id":"https:\/\/www.victronenergy.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.victronenergy.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.victronenergy.com\/blog\/#organization","name":"Victron Energy","url":"https:\/\/www.victronenergy.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/02\/victron-energy-logo_125887203.png","contentUrl":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2020\/02\/victron-energy-logo_125887203.png","width":404,"height":125,"caption":"Victron Energy"},"image":{"@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VictronEnergy.BV","https:\/\/x.com\/Victron_Energy","https:\/\/www.linkedin.com\/company\/victron-energy\/","https:\/\/www.youtube.com\/user\/VictronEnergyBV"]},{"@type":"Person","@id":"https:\/\/www.victronenergy.com\/blog\/#\/schema\/person\/1fc7df7ea591797404c8c720eff2736e","name":"John Rushworth","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a03c30c14cfa27e76e1ad9fd5372176eaaf3db08aef0af25bccd1cb56617b946?s=96&d=mm&r=g","caption":"John Rushworth"},"url":"https:\/\/www.victronenergy.com\/blog\/author\/john-rushworth\/"}]}},"popularity_stats":{"1_day_stats":1,"7_day_stats":3,"30_day_stats":7,"all_time_stats":1049},"author_name":"John Rushworth","title_plain_text":"Reserva Nacional do Gil\u00e9 \u2013 when off-grid meets off-road","excerpt_plain_text":"The Dakar Rally off-road race is quite something, yet it seems building an off-grid system in remote parts of Africa is equally daunting \u2013 8 tons of equipment needed to be transported to the\u00a0Reserva Nacional do Gil\u00e9, over \u2018roads\u2019 like those shown above. The reserve is located in the province of Zamb\u00e9zia, in Mozambique. With [\u2026]","subtitle":"","related_posts":[{"id":33440,"slug":"community-generates-four-times-the-energy-it-consumes","title":"Community generates four times the energy it consumes","link":"https:\/\/www.victronenergy.com\/blog\/2026\/06\/10\/community-generates-four-times-the-energy-it-consumes\/","excerpt":"Viewed from the village square, Alte Schmitte appears to be an ordinary residential neighbourhood. PV modules are integrated into roofs and fa\u00e7ades rather than added as separate elements, allowing the buildings to exhibit a cohesive architectural appearance. Behind that appearance, however, is an energy system that enables twenty-seven households to live in a community which&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/06\/DJI_0955_324776455-150x150.jpg","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-06-10T08:32:13+02:00","date_gmt":"2026-06-10T06:32:13+00:00"},{"id":33386,"slug":"irrigating-two-million-acres","title":"Irrigating Two-million Acres","link":"https:\/\/www.victronenergy.com\/blog\/2026\/05\/29\/irrigating-two-million-acres\/","excerpt":"Madura Plains is a remote sheep station on Nullarbor, an arid, treeless limestone plain of 200,0000km\u00b2 in south Australia. Its viability depends on bore holes, tanked-reservoirs, and a pumping system through 1400km of water pipelines to over 200 drinking troughs. Until recently water provision across the property relied on a variety of pumping arrangements which&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/05\/Screenshot-2026-05-29-at-09.06.07_323887739-150x150.png","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-05-29T17:19:32+02:00","date_gmt":"2026-05-29T15:19:32+00:00"},{"id":33326,"slug":"energy-security-guarantees-towns-water-supply","title":"Energy security guarantees town&#8217;s water supply","link":"https:\/\/www.victronenergy.com\/blog\/2026\/05\/20\/energy-security-guarantees-towns-water-supply\/","excerpt":"A remote reservoir which provides drinking water to over 35,000 customers is entirely monitored and controlled by an off-grid power installation which must not fail. Electricity energises their control systems, operates the water treatment plant, and opens and closes pump valves. The lead acid batteries which had provided back up power were coming to the&hellip;","featured_image":"https:\/\/www.victronenergy.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/05\/McMinnville_Water_and_Light-McGuire_Dam-Drone_Shots-Artek-260409-021_321822343-150x150.jpg","author_name":"justin","author_link":"https:\/\/www.victronenergy.com\/blog\/author\/justin\/","author_avatar":{"24":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=24","48":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=48","96":"https:\/\/secure.gravatar.com\/avatar\/dc1aee15dc88b16fe8302452197d07d203697be68b3ea32d831473d70ae3026b?s=96&d=mm&r=g&s=96"},"categories":[{"name":"Users stories","link":"https:\/\/www.victronenergy.com\/blog\/category\/users-stories\/"}],"date":"2026-05-20T08:40:29+02:00","date_gmt":"2026-05-20T06:40:29+00:00"}],"_links":{"self":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/11133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/comments?post=11133"}],"version-history":[{"count":36,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/11133\/revisions"}],"predecessor-version":[{"id":29325,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/posts\/11133\/revisions\/29325"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/media\/11136"}],"wp:attachment":[{"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/media?parent=11133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/categories?post=11133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.victronenergy.com\/blog\/wp-json\/wp\/v2\/tags?post=11133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}