Jan 27th - Feb 5th
http://www.seattleboatshow.com/
Centurylink field and south lake union,Seattle, US
2011 Dec 27th
Capi2 Nederland BV has entered into partnership with Victron Energy BV as part of the integration of Victron products into its Capi2 power distribution system. Read full article
![]() |
ESP DC Link BoxThe DC link box brings all the primary DC protection, DC monitoring and sensor connections into one simple to fit enclosure. It includes: • 4 Mega fuses (2x 300A, 1x 200A, 1x 100A) and 1 Midi fuse (60A). These can be changed to suit the users requirements. Mega fuses are available in sizes from 100 to 500 amps and Midi fuses from 30 to 125 amps. • 500 amp shunt. • Test button with LED's for all 5 fuses and a polarity warning LED. • Fused connection points for MultiPlus voltage sense and BMV-600 connections. • Fused connections for magnetically latching battery isolator which can be controlled via ESP system panel. • RJ 11 and 45 socket connections for ESP system panel. |
Two AC inputs with integrated transfer switch. The Quattro can be connected to two independent AC sources, for example shore-side power and a generator, or two generators. The Quattro will automatically connect to the active source.
All Quattro- and several Multi inverter/chargers now have two AC outputs. In addition to the standard no-break output, an auxiliary output is available which disconnects the connected load during battery operation. It is, for example, the perfect solution for preventing an electric water heater from discharging your battery.
